My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-032
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:10:30 PM
Creation date
2/13/2019 2:19:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/12/2019
Control Number
2019-032
Agenda Item Number
8.G.
Entity Name
Florida Department of Transportation
Subject
Public Transit Service Development Grant
Area
Indian River State College Main Campus
Alternate Name
GoLine Transit Service Development
Document Relationships
2019-016
(Cover Page)
Path:
\Resolutions\2010's\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION <br />PUBLIC TRANSPORTATION <br />GRANT AGREEMENT <br />Form 725-000-01 <br />STRATEGIC <br />DEVELOPMENT <br />OGC 12118 <br />in writing by the Department. Specific unallowable costs may be listed in Exhibit "A", Project <br />Description and Responsibilities. <br />11. General Requirements. The Agency shall complete the Project with all practical dispatch in a sound, <br />economical, and efficient manner, and in accordance with the provisions in this Agreement and all <br />applicable laws. <br />a. Necessary Permits Certification. The Agency shall certify to the Department that the <br />Agency's design consultant and/or construction contractor has secured the necessary permits. <br />b. Right -of -Way Certification. If the Project involves construction, then the Agency shall provide <br />to the Department certification and a copy of appropriate documentation substantiating that all <br />required right-of-way necessary for the Project has been obtained. Certification is required <br />prior to authorization for advertisement for or solicitation of bids for construction of the Project, <br />even if no right-of-way is required. <br />c. Notification Requirements When Performing Construction on Department's Right -of - <br />Way. In the event the cost of the Project is greater than $250,000.00, and the Project involves <br />construction on the Department's right-of-way, the Agency shall provide the Department with <br />written notification of either its intent to: <br />i. Require the construction work of the Project that is on the Department's right-of-way <br />to be performed by a Department prequalified contractor, or <br />ii. Construct the Project utilizing existing Agency employees, if the Agency can <br />complete said Project within the time frame set forth in this Agreement. <br />d.. _ If this box is checked, then the Agency is permitted to utilize its own forces and the following <br />provision applies: Use of Agency Workforce. In the event the Agency proceeds with any <br />phase of the Project utilizing its own forces, the Agency will only be reimbursed for direct costs <br />(this excludes general overhead). <br />e. If this box is checked, then the Agency is permitted to utilize Indirect Costs: <br />Reimbursement for Indirect Program Expenses (select one): <br />i. _ Agency has selected to seek reimbursement from the Department for actual indirect <br />expenses (no rate). <br />ii. _ Agency has selected to apply a de minimus rate of 10% to modified total direct <br />costs. Note: The de minimus rate is available only to entities that have never had a <br />negotiated indirect cost rate. When selected, the de minimus rate must be used <br />consistently for all federal awards until such time the agency chooses to negotiate a <br />rate. A cost policy statement and de minimis certification form must be submitted to <br />the Department for review and approval. <br />iii. _ Agency has selected to apply a state or federally approved indirect cost rate. A <br />federally approved rate agreement or indirect cost allocation plan (ICAP) must be <br />submitted annually. <br />f. Agency Compliance with Laws, Rules, and Regulations, Guidelines, and Standards. The <br />Agency shall comply and require its contractors and subcontractors to comply with all terms <br />and conditions of this Agreement and all federal, state, and local laws and regulations <br />applicable to this Project. <br />g. <br />Claims and Requests for Additional Work. The Agency shall have the sole responsibility <br />for resolving claims and requests for additional work for the Project. The Agency will make <br />6 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.