Laserfiche WebLink
Bid / Pay Items Change Order No. 2 <br />Lines that have Owner Direct Purchase are in blue. <br />Item <br />Unit <br />Estimated <br />Quantity <br />Unit Price <br />Original Total <br />Change Order <br />No. 2 <br />Revised Unit Price <br />New Total after CO <br />No. 2 <br />g. Compressed Air and Forcemain Piping, Fittings, Valves, <br />and Ancillary Components <br />- <br />0 <br />g.l. 2-inch DR 11 HDPE Compressed Air & Forcemain <br />Pipe (same trench) <br />LF. <br />15,200 <br />$4.00 <br />$60,800.00 <br />$4.00 <br />$60,800.00 <br />g.2. 2-inch Compressed Air & Forcemain Valves <br />Ea. <br />26 <br />$950.00 <br />$24,700.00 <br />$950.00 <br />$24,700.00 <br />' g.3 Well Dewatering Pump Assembly <br />Ea. <br />6 <br />$8,250.00 <br />549,500.00 <br />-531,447.33 <br />53,008.78 <br />518,052.67 <br />h. Turn-Key Air Compressor System including All <br />Equipment and Electrical Components and Connections <br />and Prefabricated Metal Panel Enclosure (17 feet x 13 feet) <br />with all appurtenances <br />L.S. <br />1 <br />$200,000.00 <br />5200,000.00 <br />-590,215.39 <br />$109,784.61 <br />5109,784.61 <br />i, Concrete Gravity Wall for Existing Pump Station <br />L.F. <br />70 <br />$350.00 <br />524,500.00 <br />$350.00 <br />$24,500.00 <br />j. Site Restoration <br />L.S. <br />1 <br />$10,000.00 <br />$10,000.00 <br />$10,000.00 <br />510,000.00 <br />k. Miscellaneous <br />L.S. <br />1 <br />50.00 <br />50.00 <br />$0.00 <br />2B. Survey <br />L.S. <br />1 <br />$89,000.00 <br />$89,000.00 <br />$89,000.00 <br />$89,000.00 <br />TOTAL BID ITEM 2 <br />-,' <br />$7,743,090.00 <br />$0.00 <br />56,369,137.21 <br />Sutiotal .. - <br />- ... <br />- <br />" 0 <br />, <br />3. PUBLIC CONSTRUCTION BOND AND INSURANCE (TOTAL) <br />L.S. <br />1 <br />5114,800.00 <br />$0.00 <br />5114,800.00 <br />0 <br />4. MOBILIZATION AND DEMOBILIZATION (TOTAL) <br />L.S. <br />1 <br />5543,000.00 <br />$0.00 <br />$543,000.00 <br />5. WATER MAIN EXTENSION AND HYDRANT <br />- '0 <br />5A. Water Main Extension and Hydrant <br />., <br />'0 <br />a. 8-inch C900 PVC, Water Main <br />L.F. <br />1,750 <br />550.00 <br />587,500.00 <br />-515,795.24 <br />$40.97 <br />571,704.76 <br />b. Directional Drill 8-inch C900 PVC Water Main <br />L.F. <br />100 <br />575.00 <br />$7,500.00 <br />-51,939.80 <br />$55.60 <br />$5,560.20 <br />c. 8-inch Tapping Saddle & Gate Valve <br />Ea. <br />1 <br />$6,000.00 <br />$6,000.00 <br />-$2,382.88 <br />$3,617.12 <br />$3,617.12 <br />d. Hydrant and Ancillary Components <br />Ea. <br />1 <br />510,000.00 <br />510,000.00 <br />-53,593.40 <br />$6,406.60 <br />56,406.60 <br />e. 2-inch Sch 80 Pipe, Hose Bibb, Meter and Backflow <br />preventer to LCS Pump Station <br />Ea. <br />'1 <br />$10,000.00 <br />510,000.00 <br />-$2,079.41 <br />57,920.59 <br />57,920.59 <br />f. Flushing, Disinfection, and Testing <br />L.S. <br />1 <br />55,000.00 <br />$5,000.00 <br />$5,000.00 <br />$5,000.00 <br />g. Miscellaneous <br />L.S. <br />1 <br />$10,000.00 <br />510,000.00 <br />-$9,196.56 <br />5803.44 <br />$803.44 <br />5B. Survey <br />L.S. <br />1 <br />$3,500.00 <br />$3,500.00 <br />$3,500.00 <br />$3,500.00 <br />TOTAL BID ITEM 5 <br />- <br />$139,500.00 <br />$0.00 <br />$104,512.71 <br />0 <br />6. LEACHATE COLLECTION SYSTEM (LCS) PUMP STATION <br />AND FORCEMAINS <br />'0 <br />. <br />6A. Leachate Collection System Pump Station <br />. . <br />- 0 <br />• .. ' <br />a. Duplex LCS Pump Station Pump Package including all <br />components for a complete system (precast wetwell, <br />hatch and safety grate, turbine meter with totalizer, <br />control panel, valves, ARV, pressure gauge, HDPE pipe and <br />fittings, ductile iron pipe and fittings, pipe supports, <br />miscellaneous appurtenances, and dewatering) <br />L.S. <br />1 <br />5150,000.00 <br />$150,000.00 <br />-$26,072.73 <br />$123,927.27 <br />$123,927.27 <br />b. 10-inch Concrete Slab and Driveway <br />S.F. <br />1,400 <br />$15.00 <br />521,000.00 <br />515.00 <br />521,000.00 <br />c. 5-Foot Diameter Pump Out Manhole <br />Ea. <br />1 <br />$20,000.00 <br />$20,000.00 <br />-58,190.44 <br />511,809.56 <br />$11,809.56 <br />6B. Leachate Forcemains <br />_ <br />• • 0 <br />a. 2-Inch Dual Contained (in 4-Inch) HDPE Forcemain <br />L.F. <br />292 <br />$45.00 <br />513,140.00 <br />-53,380.34 <br />533.42 <br />$9,759.66 <br />b. 2-Inch Plug Valve <br />Ea. <br />2 <br />$2,000.00 <br />$4,000,00 <br />-51,687.77 <br />51,156.12 <br />52,312.23 <br />c. 4-Inch Solid SDR 11 HDPE Forcemain <br />L.F. <br />1,700 <br />$30.00 <br />$51,000.00 <br />-$7,389.45 <br />$25.65 <br />543,610.55 <br />d. Directional Drill 4-Inch Solid DR 11 HDPE Forcemain <br />L.F. <br />100 <br />5100.00 <br />510,000.00 <br />5100.00 <br />510,000.00 <br />e. 4-Inch Plug Valve <br />Ea. <br />2 <br />$1,500.00 <br />$3,000.00 <br />-51,019.09 <br />$990.46 <br />51,980.91 <br />6C. Survey <br />L.S. <br />1 <br />$3,500.00 <br />53,500.00 <br />$3,500.00 <br />$3,500.00 <br />TOTAL BID ITEM 6 <br />$275,640 <br />$227,900 <br />7. CONTINGENCY ALLOWANCE (10%) <br />L.S. <br />1 <br />51,457,660.00 <br />51,457,660.00 <br />Total Change Order No. 2 <br />-52,659,127.14 <br />GRAND TOTAL BID (Items l-6 <br />CS 14(, 1&f 00 <br />IIIIIMII. <br />f:.02 L1 1. 7e•ef <br />�� <br />GRAND TOTAL BID (Items 1-6 and 7) <br />,c}EI[yft • 0 eo <br />New Grand Total After Change Order No. 2 <br />- <br />'1s 7• 'l:' 8� <br />CDM <br />Ij2193_Att 1.xlsx <br />020I8 COM SmIth Inc. <br />All R,ghts Reserved <br />3 of 3 <br />