Laserfiche WebLink
CHANGE ORDER NO. 1 - FINAL <br />DESCRIPTION OF ITEMIZED CHANGES <br />PROJECT NAME: GIFFORD AREA STORMWATER PROJECT <br />I.R.C. PROJECT NO. 1502 BID NO. 2018045 <br />. xoar <br />Yic_ 44 zo _ x <br />U_nit <br />qu_, a. ni1 <br />;-UnPri..:ce , <br />cA,Iricrease <br />'7 ICe Deicrease, <br />120-1 <br />REGULAR EXCAVATION <br />CY <br />17 <br />17.00 <br />289.00 <br />700-1-40 <br />SINGLE SIGN POST - INSTALL <br />EA <br />11 <br />250.00 <br />2,750.00 <br />900.00 <br />1080-15 <br />UTILITY FIXTURE, ADJUST & MODIFY <br />EA <br />3 <br />300.00 <br />285-7-11 <br />OPTIONAL BASE, BASE GROUP 11 <br />SY <br />30 <br />20.00 <br />600,00 <br />334-1-11 <br />SUPERPAVE ASPHALTIC CONC, TRAFFIC A, 1-1/2" <br />TN <br />12 <br />415.00 <br />4,980.00 <br />430-174-215 <br />PIPE CULV, 14" X 23" ERCP <br />LF <br />45 <br />100.00 <br />4,500.00 <br />430-982-625 <br />MITERED END SECT, 14" X 23" <br />EA <br />1 <br />1,700.00 <br />1,700.00 <br />530-3-4 <br />RIPRAP, RUBBLE, R & I DITCH LINING <br />TN <br />19 <br />140.00 <br />2,660.00 <br />570-1-2 <br />PERFORMANCE TURF, SOD <br />SY <br />212 <br />5.00 <br />1,060.00 <br />WCD 1 <br />ADDITIONAL WORK/UTILITIES <br />LS <br />1.00 <br />23,009.32 <br />23,009.32 <br />FORCE ACCOUNT <br />30,000.00 <br />SUBTOTALS <br />38,509.32 <br />33,939.00 <br />GIFFORD AREA STORMWATER PROJECT TOTAL $ 4,570.32 <br />113 <br />00310-1 <br />F:1Publio Works\ENOINEERING DIVISION PROJECTS11502-E Gifford Dminago_41,1 01 to 43rd 5111-AdmIn1ogonda iloms\ProJect ClosaoulORC-1502_FCO_20190100 <br />