Laserfiche WebLink
FORM 710-010-171 <br />4/8/88 <br />Page 2 of 2 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION <br />UTILITY RELOCATION SCHEDULE <br />WPI <br />NO. <br />PROJECT NO. STATE ROAD <br />COUNTY <br />PARCEL <br />PAP NO. <br />4115407 <br />1 88004-3500 507 <br />Indian River <br />' N/A <br />Federal Funds <br />UMITY AGENCY/OWNER <br />D. <br />Construction Activities: (Use activities that apply and activities that are <br />neaded)s <br />I. <br />Before Construction Begins <br />( ) days <br />2. <br />Immediately after Clearing & Grubbing <br />( ) days <br />3. <br />During Grading <br />( 3 ) days <br />4. <br />During Drainage <br />( ) days <br />5. <br />stabilizing <br />( ) days <br />6. <br />Bridge Construction <br />( ) days <br />7. <br />Protecting Existing Utilities <br />( ) days <br />8. <br />Pile Driving <br />( ) days <br />9. <br />Traffic signals <br />( ) days <br />10.Highway <br />Lighting <br />( ) days <br />11. <br />Paving <br />( I days <br />NOTE: Total of items 1 thru construction/adjustment/ <br />relocation days on project. <br />30 days <br />Continuation o Block A d ) Block B 1 1 special Notat ons <br />* Days are on an item -by -item basis. There appears to be <br />approximately 15 points of conflict outside the paved area <br />with 3, days each; however, this is concurrent with your <br />work, not in addition to. <br />