Laserfiche WebLink
PROPOSED <br />Table 4.7.4 <br />2010 Major Roadway Improvements <br />Fictlity From To <br />Project <br />Length (ML) <br />Exist Rdwy <br />Type* <br />Improvement <br />Type <br />Estim®ted <br />Cost <br />U.S. 1 4th St St. Lucie County <br />4.3 <br />4LD <br />Add 2 Las <br />$6,957,940 <br />S.R. 60 66th Ave 82nd Ave <br />2.0 <br />4LD <br />Add 2 Las <br />52,942,600 <br />S.R. 60 82nd Ave 1-95 <br />2.0 <br />4LD <br />Add 2 Las <br />$2,942,600 <br />C.R. 512/Fellsmere Rd C.R. 510 Roseland Rd <br />1.4 <br />2LU <br />Add 2 Las <br />52,554,400 <br />C.R. 512/Fellsmem Rd I.95 C.R. 510/Wabasso Rd <br />2.6 <br />2LU <br />Add 2 Im <br />S3,750,000 <br />Citrus Highway St. Lucie Co Line C.R. 510 <br />9 <br />— <br />New 2Lns <br />S10,398,400 <br />Oslo Rd/9th St S.W. Old Dixie Hwy 27th Ave <br />2.0 <br />2LU <br />Add 2 Lns <br />53,500,200 <br />Oslo Rd/9th St S.W. 27th Ave 82nd Ave <br />5.1 <br />2LU <br />Add 2 Las <br />58,387,580 <br />27th Ave 12th St St. Lucie County <br />3.4 <br />2LU <br />Add 2 Las <br />$5,452,070 <br />53rd St U.S.1 58th Ave <br />2 <br />— <br />New 4Lns <br />S1,994,100 <br />66th Ave S.R. 60 Oslo Rd/9th St. S.W. <br />3.15 <br />— <br />New 2 Las <br />51,249,480 <br />66th Ave/Schumann Dr U.S. 1 Barber St/Stratton <br />1.9 <br />2LU <br />Add 2 Lns <br />$2,961,020 <br />Barber SUStratton Ave C.R. 5I2 U.S. 1 <br />3.7 <br />2LU <br />Add 2 Las <br />$1,000,000 <br />C.R. 510/Wabasso Rd C.R. 512 66th Ave <br />4.2 <br />2LU <br />Add 2 Las <br />$5,000,000 <br />C.R. 510/Wabasso Rd 66th Ave U.S. 1 <br />1.6 <br />2LU <br />Add 2 Lns <br />52,494,520 <br />66th Ave/Schumaml Dr C.R. 510 S.R. 60 <br />7.6 <br />2LU <br />Add 2 Im <br />512,627,080 <br />26th St 43rd Ave 58th Ave/Kings Hwy <br />1.0 <br />2LU <br />Add 2 Lns <br />$2,094,800 <br />26th St 58th Ave 66th Ave <br />1.0 <br />— <br />New 4 Las <br />52,211,200 <br />Roseland Rd U.S. 1 C.R. 512 <br />3.7 <br />1 2LU <br />Add 2 Las <br />$5,720,420 <br />*Key: <br />2LU - 2 Lane Undivided Roadway <br />4LD - 4 Lane Divided Roadway <br />These projects are consistent with the 1996-2010 interim year sets of the Indian River County MPO's adopted <br />2020 Long Range Transportation Plan. <br />Traffic CIMLIMticm 110100t <br />1G/lugs <br />M"PO I . LS <br />