My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-038
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:17:29 PM
Creation date
3/7/2019 3:26:55 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/05/2019
Control Number
2019-038
Agenda Item Number
8.I.
Entity Name
Atkins North America. Inc.
Subject
6th Avenue resurfacing
Area
6th Avenue from US HIghway 1 to 21st Street
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATKINS <br />TASK 3: EXISTING CONDITIONS REVIEW <br />Atkins will review the existing survey of the roadway area provided by the County and will make a site <br />visit to review the project area. A list of existing conditions and the survey with field markups will be <br />provided to the County. This task also includes meeting with County Staff to review the project and discuss <br />areas of particular concern. <br />TASK 4: ROADWAY PLANS <br />1. Based on review of the information obtained in Tasks 1, 2 and 3, the Consultant will prepare design <br />and construction documents for the proposed improvements. The construction documents will be <br />prepared in 11x17 inch format and will include the following drawing sheets: <br />• Key Sheet, <br />• Summary of Pay Items, <br />• Typical Section & Cross Slope Correction Details, <br />• Project Layout and Control, <br />• General Notes, <br />• Roadway Plan, <br />• Cross Sections (at points of interest, up to 15 Cross Sections), <br />• Stormwater Pollution Prevention Plan, <br />• Signing and Pavement Markings, <br />• Signalization Plans (Task 5). <br />Any storm sewer improvements, utility adjustments, clearing and grubbing areas will be shown on <br />the plan sheets. Side walk grade spot elevations will also be shown on the plan sheets in lieu of <br />sidewalk profiles. Pavement markings will be based on existing aerial photograph. Applicable <br />FDOT standard index sheets, including Index 600 Traffic Control Details will be provided as a <br />separate attachment to the plan set. <br />Plans will be submitted to the County for review at the 60%, 90% and 100% design stages. Final <br />100% Construction Documents signed and sealed will be submitted to the County for record. <br />2. Prepare three (3) estimates of probable construction costs based on 60%, 90% and 100% <br />Construction Documents. Asphalt quantities computed for cross slope correction will be based on <br />evaluation of roadway section elevations via spreadsheet (a 3-D corridor will not be generated). <br />The area of any easements or right of way required for construction of the proposed improvements <br />will be shown on the roadway plan sheets but no dollar value will be assigned. <br />3. Provide technical specifications for the project. The technical specifications will be based on an <br />approved current edition provided by the County. Specifications shall be submitted to the County <br />for review with the 90% and 100% design submittal. <br />February 14, 2019 <br />Page 3 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.