My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/05/2019
CBCC
>
Meetings
>
2010's
>
2019
>
02/05/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 11:36:54 AM
Creation date
3/13/2019 1:39:15 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/05/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sample Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) <br />and Vero Beach Roofing, Inc. (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in <br />consideration of the mutual covenants hereinafter set forth, agree as follows: <br />ARTICLE 1- WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is <br />generally described as follows: <br />Replacement of existing flat rubber roof with 20 -year warrantable metal roof system <br />ARTICLE 2 -THE PROJECT <br />The Project for which the Work under the Contract Documents may be the whole or only a part is generally <br />described as follows: <br />Project Name: Sandridge Golf Club Maintenance Building Roof Replacement <br />Bid Number: 2019027 <br />Project Address: 5300 73'd Street; Vero Beach, FL 32967 <br />ARTICLE 3 - CONTRACT TIMES <br />3.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final <br />payment as stated in the specifications are of the essence of the Agreement. <br />3.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be completed and ready for final payment on or before the 30th day after the date <br />when the Contract Times commence to run. <br />ARTICLE 4 - CONTRACT PRICE <br />4.01 OWNER shall pay CONTRACTOR for completion of the Work an amount in current funds equal to <br />the sum of the amounts determined pursuant to paragraph 4.01.A and summarized in paragraph <br />4.01.B, below: <br />A. For all Work, at the prices stated in CONTRACTOR's Bid, attached hereto by reference. <br />B. THE CONTRACT SUM subject to additions and deductions provided in the Contract Documents: <br />Numerical Amount: $60,013.00 <br />1 <br />96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.