My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/05/2019
CBCC
>
Meetings
>
2010's
>
2019
>
02/05/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 11:36:54 AM
Creation date
3/13/2019 1:39:15 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/05/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSENT <br />INDIAN RIVER COUNTY, FLORIDA <br />BOARD MEMORANDUM <br />TO: <br />THROUGH: <br />FROM: <br />SUBJECT: <br />Jason E. Brown <br />County Administrator <br />Richard B. Szpyrka, P.E. <br />Public Works Director <br />Kendra Cope, M.S. <br />Environmental Specialist <br />Release of Retainage for Work Order No. 12 CB&I Coastal Planning and <br />Engineering, Inc. Sector 5 Beach Restoration Project — Design and <br />Permitting Services <br />DATE: January 17, 2019 <br />DESCRIPTION AND CONDITIONS <br />On March 19, 2013 the Board approved a contract with CB&I Coastal Planning and Engineering, <br />Inc. (CB&I) for professional coastal engineering services in Indian River County for a two-year <br />term, 2013-2015. On March 17, 2015, the Board renewed the contract until March 19, 2017. <br />CB&I is the selected County consultant for professional coastal engineering services related to <br />the Sector 5 Beach Nourishment Project. On August 14, 2017 the County was notified of CB&I's <br />acquisition with Aptim Coastal Planning and Engineering, Inc (APTIM). From that date forward, <br />all correspondence was made by APTIM. <br />On April 12, 2016, the Board approved Work Order No. 12 to this contract for Design and <br />Permitting services for the Sector 5 Beach and Dune Restoration project. Work Order No. 12 <br />included lump sum services in the amount of $142,763. All work under Work Order No. 12 is <br />now 100% complete. The total amount of retainage withheld under Work Order No. 12 is <br />$14,276.31. <br />APTIM, is requesting the release of all withheld retainage in the amount of $14,276.31. <br />FUNDING <br />The release of retainage in the amount of $14,276.31 is included in local beach restoration <br />funding through a portion of Local Option Tourist Tax Revenue as well as allocation of the One <br />Cent Sales Tax. Funding for the release of retainage is available in Account # 128-206000- <br />15021. <br />C:\Users\legistar\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@COODEOD5\@BCL@COODEOD5.docx <br />45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.