My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/18/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
12/18/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 1:07:41 PM
Creation date
3/20/2019 11:03:01 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/18/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Prior to the issuance of a certificate of occupancy (C.O.), the applicant shall: <br />a. Install all required landscape buffers and opaque features. <br />b. Obtain County approval of the US 1 turn lane improvements. <br />C. Repair or replace the sidewalk along the site's US 1 frontage, as determined by Public <br />Works. <br />d. Plant any required mitigation trees. <br />5. Project construction must follow County construction hours regulations under 974.04(2): <br />(2) Construction equipment and activity. It shall be unlawfW to operate any equipment or <br />perform any outside construction or repair work on buildings, structures, roads, or projects <br />within the county between the hours of 8:00 p.m. and 6:00 am. unless an administrative <br />approval as set forth in section 974.07 for such construction or repair work between such hours <br />has been obtained from Indian River County on the basis of good cause shown. <br />Upon satisfaction of the approval conditions, the applicant shall provide, in writing, the intent to begin <br />construction and arrange an appointment with a Current Development Division staff member to release <br />the approved plan. <br />Please be advised that site plan approval shall terminate and become null and void without notice if <br />construction has not commenced within 24 months from the date of approval. Site plan approval may be <br />extended one time only for good cause by the Board of County Commissioners for a period not to <br />exceed 12 months. Construction shall be considered abandoned and site plan approval may be <br />terminated if a good faith effort to proceed voth the completion of the project has not occurred for a <br />continuous period of 6 months. <br />Be advised dw the Code Enforcement Department may conduct periodic inspections to ensure the <br />project is completed in accordance with the approved site plan. UQon completion of construction of <br />e; eh inulti-famabuilding, the aprolicant shall sub ie a formal request for certificate of <br />occupancy site Inspections thrangh tha Pla�Division. see attachyd checklist for sabmittal <br />Instructions. <br />If you require any additional assistance please contact me at 772-226-1235 or jmccoy rz iregov.com. <br />Sincerely, <br />jolm W. McCoy, AICD <br />Chief, Current Development <br />Attachment: Site Plan CO Checklist <br />cc: Stan Boling, AICP (via e-mail) <br />John W. McCoy, AICP <br />Vincent Burke (via e-mail) <br />Aijuna Weragoda (via e-mail) <br />John King (via a -mail) <br />Richard B Szpyrka, P.E. (via a -mail) <br />100 <br />F:iCommunity Develop=ntiCurE?etP&MO161TheRivcrPmsavaP7.C.whr.dw 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.