My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/18/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
12/18/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 1:07:41 PM
Creation date
3/20/2019 11:03:01 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/18/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" <br />MASTELLER & MOLER. INC. <br />M ^- CIVIL ENGINEERS — <br />RESERVE AT GRAND HARBOR (PHASE 1) <br />CERTIFIED COST ESTIMATE <br />FINAL LIFT ASPHALT <br />12/5/2018 <br />Description <br />Quantity <br />Unit <br />Unit Price <br />TOTAL <br />Mobilization <br />1 <br />LS <br />$3_,500.00 <br />$3,500.00 <br />1.0" SP 9.5 - 2nd Lift (Grand Harbor Reserve Sq.) <br />3,321 <br />SY <br />$9.00 <br />$29,889.00 <br />Mill Existing Asphalt (1.5") <br />9,579 <br />SY <br />$3.00 <br />$28,737.00 <br />Overlay w/ 1.5" SP 9.5 Asphalt <br />9,579 <br />SY <br />$10.50 <br />$100,579.50 <br />Restdpe Pavement <br />1 <br />LS <br />$4,000.00 <br />$4,000.00 <br />Reset PCP's <br />1 <br />LS <br />$3,000.00 <br />$3,000.00 <br />TOTAL <br />$169,705.50 <br />Surety Amount 125% $212,131.88 <br />CERTIFICATE OF COST ESTIMATE &W';- <br />1, <br />NGI, Stephen E. Moler, a Florida registered engineering, License No. 33193, do hereby certify to Indian River County that this <br />cost estimate has been prepared under my responsible direction for those improvements itemized in this exhibit and that the <br />total cost estimate is true and accurate to the best of my knowledge. This estimate has been prepared, in part, to induce <br />approval by the County of a final plat for the Reserve at Grand Harbor Phase 1 project, and for the purpose of establishing <br />proper surety amounts associated therewith. <br />QN� N f . 2i�'`'�- <br />y,`�.�`�NSF :Old,, <br />���3193 .'�op: <br />Stephen E. Moler, F.L <br />Vice President '•;�,c�;'C.ORID ,4 �c�;< <br />AL <br />` <br />Filek1357 1655 27th Street, Suite 2 Page 1 of 1 <br />ADMIN\Construction\Maintenance Bond Estimate Vero Beach, Florida 32960 129 <br />(PerformanceBond FinalUttAsphaR_Extension_18-120.5.xlsx) (772) 567-5300 <br />
The URL can be used to link to this page
Your browser does not support the video tag.