Laserfiche WebLink
Mr. Arjuna Weragoda, P.E <br />March .14, 2019 <br />Page 4 <br />samples will be collected from four areas and analyzed for: pesticides, herbicides, and arsenic. <br />If maintenance and/or fuel storage areas or other hazardous materials use or storage are <br />identified, additional sampling and analysis may be required. <br />Task 5 = Stormwater Review.- $8,133 <br />A desktop review of the drainage and flood conditions of the site will be completed to coordinate <br />the potential constructability of the potential reclaimed water storage area We note that the <br />establishment of a flood elevation, if not available:from FEMA, is beyond the scope of this <br />project. We will estimate the floodplain compensation that would be required if the land were to <br />be developed. <br />The following documents will be reviewed as part of this evaluation: <br />ERPs for the property comprising.the 250 -acre parcel,. if available; <br />Topographic survey for the property comprising the 250 -acre parcel, if available; <br />Conservations easements for the property comprising the 250 -acre parcel, if available; <br />Readily available USDA soil information; <br />Readily available USGS topographic information to determine overall drainage patterns; <br />Local stormwater regulations; and <br />Results of geotechnical analysis. <br />Task 6 -.Summary Report - $5,680 <br />A summary report of all findings will be prepared for this due diligence effort, and will include: <br />General Property, Land Use, Permitting, and. Zoning Review; <br />Results of the Phase I. ESA (provided. as a separate Appendix); <br />Results of the Geotechnical Analysis; <br />Results of the Ecological Review: <br />Identification of threatened.and.endangered species: which have potential to inhabit the <br />site and permitting action necessary to mitigate in the event of development of the site; <br />Results, of the desktop mapping analysis; and <br />•_ Other potential development constraints raised during the investigation 'including <br />permitting issues. <br />General summary and conclusion of design and permitting limitations anticipated for the site. <br />Tetra Tech will provide general order of magnitudecosts for the design; permitting and <br />construction of the proposed reclaimed water storage facility. The estimates will be made <br />without detailed engineering data and subsequently will have :a wide accuracy range. Please note <br />that -this level of cost estimating is intended for project'screening, concept evaluation and <br />alternative scheme analysis. <br />TETRA TECH <br />