My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-051
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:25:35 PM
Creation date
3/27/2019 10:37:45 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/26/2019
Control Number
2019-051
Agenda Item Number
12.G.3.
Entity Name
Tetra Tech
Subject
Point Source Facilities Allocations and Canals Reclassification
Project Number
CCNA2018 Work Order 03
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B <br />Tetra Tech, Inc. <br />Indian, River County <br />Professional Services Hourly Rate Fee Schedule <br />Effective October 1, 2017, through September 30, 20201s1 <br />Raw labor Rates Direct Labor Raw Labor Rates x Multiplier <br />Rate <br />Position/11ttes Minimum Maximum Multiplier Mbtbnunm Maximum <br />Project Managemeet <br />Sr.Projet Manager $ 52.00 $ 80.00 3.0 $ 156.00 $ 240.01 <br />Project Manager 5. 41.00 $ 68.00 3.0 5 123.00 $ 204.00 <br />Engineers <br />Principal Engineer $ 70.00 $ 59.00 3.0 $ 210.00 $ 297.00 <br />31. Engineer 5 50.00 $ 79.00 3.0 $ 150.00 $ 237.00 <br />Engineer $ 39.00 $ 61.00 3.0 $ 117.00 $ 183.00 <br />Engineer IV 5. 32.00 S 49.00 3.0 $ 95.00 $ 347.00 <br />Engineer lir $ 26.00 $ 40.00 3.0 5 78.00 5 120.00 <br />Engineer II $ 24,00 $ 34.00 3.0 $ 72.00 $ 102.00 <br />Engineer1 $ 22.00 S 29,00 3.0 6 66.00 $ 87.Ori <br />Engineering Technician $ 12.00 $ 22.00 3.0 $ 36.00 5 66.00 <br />Sckntists <br />Scientist VI' $ 45.00 $ 71.00 3,0 $ 135.03 $ 213.00 <br />Scientist $ 31.00 $ 57.00 3.0 $ 93.03 $ 171,00 <br />Scientist IV $ 27.00 5 38.00 3,0 . $ 81.03 $ 114,00 <br />Scientist III $ 24.00 5 30.00 3.0 $ 72.03 $ $0.00 <br />'Scientist II $ 20.00 $ 25.00 3.0 $ 80.0 $ 78.00 <br />Scientist I S. 19.00, $ 23.00 3,0 $ 57.03 $ 69.00 <br />Design Professionals <br />Sr CAO/Eng Designer ll $ 39.00 $ 52.00 3.0 5 117,00 5 156.00 <br />Sr CAD/Eng Designer I , $ 26.00 $ 40.00 3.0 $ 78,00 $ 120.00 <br />'CAD/Engineering0esi@nerill 5 24.00 5 33.0,0 3.0 5 72.00 S 99.00 <br />CADJEnglneeringDesigner II 5 18.00 $ 24.00 3.0 $ 54.60 5 72.00 <br />CAD/Engin se ring Designer l $ 16.00 $ 21.00 3.0 $ 48.00 $ 63.06 <br />Surveyors- <br />.5r <br />urveyors5r Land Surveycr . $ 41.00 $ 50,00 3.0 $ 123.00 $ 150.00 <br />Land Surveyor $ 28.00 $ 40.00 3.0 5 84.00 S 120.03 <br />SurveyCrew,Chief $ 24.00 $ 33,00 3.0 $ 72.00 • $ 314.03 <br />SurveyTech _ $ 17.00 $ 3000 3.0 $ 51.00 $ 90.03 <br />architects <br />Architectural Program Mgr S 05.00 $ 85.00 3.0 S, 195.00 $ 255,00. <br />5r Architect $ 55.00 $ 75.00 3.0 5 165.00 $ 225.03 <br />Architect $ 35.00 $ 55.00 3.0 $ 105.00 • 5 165,00 <br />Architectural Designer $ 17.00 $ 35.00 3:0 $ 51.00 $ . 105,00 <br />Cdnstructton Professionals <br />.Constructionproject Rep • S 2.2.00 $ 42.00 3.0 $ 66.00 $ 126.00 <br />Construction Manager I. $ 50.00 ' $ 70.00 3.0 $ 150.00 $ 210.00 <br />Construction Manager I 5 38,00 $ 54.00 3.0 5' 114.00. 5 152.00 <br />Construction Administrator 5 23.00 • $ 39.00 3.0 $ 69.00 $ 117.00 <br />Gl$Anafysss <br />Sr.Analyst $ 30.50 5 G5.00. 3.0 5 80.00 $ 195.00 <br />.ProjectAnarys:ll S 24.00 5 40.00 3.0 5 72.00 S 120.00 <br />Pr jectAnalyst.i $ 18.00 5 28.00 3.0 $ 54.00 $ 84,00 <br />ProJectAdmin/strotlon <br />Sr Project Administrator $ . 27.00' S 35,00 3.0 $ 81.00 5. 105.00 <br />Project Adrininistrator ' $ 15.00 $ 32,02 3,0 5 .45.00 $ 96.00 <br />Project Assistant $ 22.00 $ 22,00 3.0 .5 .30.00 $ 66,00 <br />COntract Administrator $ 25.00 $ 36,00 3.0 •5 75.00 5 108.00 <br />Sobeonsultant <br />Relmbariable Expenses,,, <br />Engineer's Relmbursable.f,avoJ/MRoage At Cost <br />Other Direct Costs . _ At Cast <br />Cost +10.96 <br />t'lThese hourly billing rates 'Mil reman'effecttve for the Initial duration of this Agreement, and may be renegotiatedshould <br />an additional renewal period be exercised. <br />
The URL can be used to link to this page
Your browser does not support the video tag.