Laserfiche WebLink
the Master Planning task, and are not available, ATKINS will identify additional services that <br />may be needed to fill these needs.' <br />Subtask 2.2 Service Area Analysis and Demand Projections <br />An evaluation will be conducted on whether sections of the service area are economically, <br />hydraulically feasible and worthy of including reclaimed water service. Demand projections <br />will be omitted from areas that deem not feasible. The development of reclaimed water <br />demands will include service areas confirmed feasible for reclaimed water distribution. <br />Subtask 2.2.1 Review of Previous Master Plans <br />ATKINS will review and summarize the most current master planning documents for reclaimed <br />water. The demand data used for previous master planning efforts will be summarized and <br />categorized land uses identified for the demand development. <br />Subtask 2.2.2 Growth Projection Evaluation <br />Future growth projections will be developed from data published by the University of Florida <br />Bureau of Economic and Business Research (BEBR) and the.SJRWMD population projections, as <br />well as discussions with IRCDUS. ATKINS will utilize the current IRCDUS Land Plan to <br />categorize each parcel within IRCDUS 's service areas. ATKINS'will participate in one meeting <br />with staff from the IRCDUS Planning Department to identify planned development and <br />projected growth through the 20 -year planning period. <br />Subtask 2.2.3 Current and Historical Data Review <br />ATKINS will review and summarize IRCDUS 's current reclaimed water billing data; historical <br />reclaimed water production; historical wastewater treatment; and SCADA at the reclaimed <br />water pump stations. <br />Subtask 2.2.4 Development of Demands/Flows <br />Utilizing the demand and flow data compiled in Subtasks 3.2.1 through 3.2.3, ATKINS will <br />develop current and projected reclaimed water demands for IRCDUS 's service areas. ATKINS <br />will develop low, medium, and high demand projections through a collaborative effort with <br />IRCDUS. Reclaimed water demands will consist of average day, maximum day, and peak hour <br />scenarios. The demands and flows will be developed in such a manner as to be useful in the <br />reclaimed water distribution system model (i.e. within areas and nodes - of the reclaimed water <br />system). Projections will include 5, 10, and 20 -year horizons. <br />Subtask 2.2.5 Demand Projection Workshop <br />ATKINS will develop a summary of the population / demand forecast data and will prepare <br />and facilitate a workshop with IRCDUS to review the various agency demand forecasts. The <br />purpose of this workshop is to secure IRCDUS concurrence with demand projections. <br />Subtask 2.3 Technical Memorandum <br />ATKINS will summarize the GIS data collected in Task 3.1 and the demand projections <br />developed in Task 3.2 in a Technical Memorandum. The Technical Memorandum will identify <br />any deficiencies that require additional research or effort to collect or develop. Three copies of <br />the draft Technical Memorandum will be submitted to IRCDUS for review. Comments received <br />