Laserfiche WebLink
Summary Technical Memorandum will be submitted to IRCDUS for review. One copy of the <br />draft Technical Memorandum will be provided in Portable Document Format (PDF) on a CD. <br />Comments received on the draft Technical Memorandum will be incorporated into the Master <br />Plan. <br />Task 6 Evaluation and Findings Workshop <br />Objective: Conduct a workshop with IRCDUS staff to compare alternatives and select a recommended <br />plan. <br />ATKINS will prepare for and conduct a workshop to go over the findings, alternatives, and <br />recommendations of the tasks supporting the Master Plan. One of the goals of the workshop <br />will be to compare reclaimed water alternative costs and non -cost factors and to select the <br />recommended plan. Preparation for this workshop will include the development of maps, <br />graphics and tables of costs and non -cost factors for the alternatives. The purpose of the <br />workshop will be to select a recommended plan. A one -day workshop with IRCDUS staff will <br />be included. ATKINS will prepare a summary of the workshop noting information presented <br />and decisions made. <br />Task 7 Development of a Comprehensive Master Plan <br />Objective: The Master Plan will compile the system evaluation and planning information from the asset <br />classes into a single document and will include a comprehensive capital improvement plan spanning the <br />asset classes. <br />ATKINS will compile a Master Plan covering IRCDUS 's reclaimed water treatment systems. <br />ATKINS will develop the Master Plan based on the results of the tasks included in this Scope of <br />Work. <br />Subtask 7.1 Draft and Final Version of the Master Plan <br />ATKINS will prepare one draft and the final version of the Master Plan as described in this <br />section. The document will include the following sections: <br />• Executive Summary - The CONSULTANT will prepare an Executive Summary of the <br />Master Plan. <br />• Introduction - ATKINS will develop and prepare an introduction that will include a <br />brief outline of the Master Plan, including goals and objectives and brief descriptions of <br />the subsequent sections. <br />• Development of Reclaimed Water Demands -The section will include a summary of <br />the work completed under Task 3 of this Scope of Work. Current and future land use <br />(coordinated with local land plans); development of typical reclaimed water demands; <br />and estimates of future demands and applicable peaking factors at 5 -year, 10 -year, and <br />20 -year planning horizons. <br />