My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/22/2019
CBCC
>
Meetings
>
2010's
>
2019
>
01/22/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 11:30:03 AM
Creation date
3/27/2019 11:59:16 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/22/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />BOARD MEMORANDUM <br />CONSEN <br />TO: <br />THROUGH: <br />FROM: <br />SUBJECT: <br />DATE: <br />Jason E. Brown <br />County Administrator <br />Richard B. Szpyrka, P,E. <br />Public Works Director <br />Kendra Cope, M.S. <br />Environmental Specialist <br />Work Order No. 9 - Morgan & Eklund, Inc. Legal Descriptions and <br />Sketches for Construction Easements in Sectors 3, 5 and 7 <br />January 9, 2019 <br />DESCRIPTION AND CONDITIONS <br />On October 4, 2016, the Board approved a contract with Morgan and Eklund, Inc. (M&E) for <br />Professional Land Surveying and Mapping Services for a two-year term. The Board amended the <br />Contract on October 18, 2016. The contract was renewed for an additional two-year term on <br />October 4, 2018. M&E is the selected County Consultant for professional onshore/offshore <br />hydrograOhic surveying and mapping services. <br />As a part of the permit process for Beach and Dune Restoration projects, the State requires an <br />Erosion Control Line (ECL) be established over the entire project area. The ECL identifies the <br />location of the Mean High Water Line within the project area and is referenced in construction <br />easements signed by property owners prior to construction. The ECL for Sectors 3 and 7 were <br />established prior to the original Beach and Dune Restoration projects constructed in 2010 and <br />2007, respectively. However, the temporary construction easements signed by property owners <br />have either expired or include language that is outdated. In order to place sand fill on private <br />property as surveyed under the ECL during the Sector 3 and Sector 7 Beach and Dune <br />Renourishment projects, Indian River County is required to obtain a new Construction Easement <br />from property owners within the Sector 3 and 7 Project areas. <br />On May 1, 2018, the Board approved Work Order No. 6 with Morgan and Eklund, Inc. which <br />authorized professional surveying services necessary to establish an ECL for the Sector 5 Beach <br />and Dune Restoration project area. Once the Mean High Water line has been delineated, Indian <br />River County is required to obtain a Construction Easement from property owners within Sector <br />5, in order to place sand fill on private property as surveyed under the ECL during the Sector 5 <br />Beach and Dune Restoration project, expected to begin November 2019. <br />C:\Users\legistar\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@B00D8777\@BCL@B00D8777.docx <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.