My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/19/2019
CBCC
>
Meetings
>
2010's
>
2019
>
02/19/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 11:44:17 AM
Creation date
3/27/2019 12:59:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/19/2019
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A - SCOPE OF WORK <br />It is our understanding that the COUNTY intends to do repairs at the existing Roseland Community <br />Center located at 12973 83rd Avenue in Sebastian. <br />The proposed design improvements will consist of leveling and securing the existing floor, constructing <br />one handicapped parking space to comply with ADA regulations, remove and replace existing front <br />sidewalk and provide minor drainage improvements at the front of the site to alleviate the present <br />erosion condition on the SW corner of the building due to stormwater runoff at this location. <br />These improvements will require an existing conditions survey and it is understood that all existing <br />conditions survey information required will be provided by IRC in CAD. As such, MBV Engineering, Inc. <br />will provide the design and permitting services for this project and as below in further detail. <br />Design Services <br />a. Civil Design Plans <br />The Consultant will prepare 24" x 36" design drawings for the above described improvements <br />and will include the following: Existing Conditions Plan (Existing Conditions survey to be <br />provided by IRC), Demolition Plan needed for proposed improvements, Erosion Control Plan, <br />Site Plan, PGD Plan and Details Plan. <br />b. Structural Design Plans <br />The Consultant will prepare 24" x 36" design drawings for the above described improvements and will <br />include the following: Demolition Plan needed for proposed improvements, Framing Plan, Structural <br />Details and Connection Plan. <br />c. County Reviews and Revisions <br />The Consultant will coordinate with the COUNTY staff during design development for these <br />plans at the 50% and 100% completion phases. COUNTY staff shall provide review comments <br />to Consultant for each phase. Consultant will revise plans for up to two (2) rounds of comments <br />from COUNTY within reasonable scope of the project. <br />Permitting Services <br />The Consultant will prepare the following permit applications and associated submittals for the <br />following agencies: <br />• Indian River County Administrative Approval <br />• Indian River County ROW <br />• St. Johns River Water Management District Exemption Request Letter <br />This Work Order does not include stormwater modeling, wetlands or other ecological permitting. <br />The Consultant shall respond to up to two (2) request for additional information by the permitting <br />agency. <br />The COUNTY will be responsible for the above listed permit fees and the Consultant will prepare all <br />necessary applications and provide to COUNTY for signatures. <br />76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.