My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-053
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:26:10 PM
Creation date
3/29/2019 2:49:11 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
03/26/2019
Control Number
2019-053
Agenda Item Number
15.B.7.
Entity Name
Thalle Construction
Subject
Landfill Project
Area
Segment 3 Cell 2 Expand Segment 2 Partial Closure
Alternate Name
Landfill Gas System Expansion
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THLLE <br />r <br />CONSTRUCTION CO&1PANY <br />A TULLY GROUP COMPANY <br />Esiablished 119'17 <br />February 14, 2019 VIA EMAIL: LewisMJ@cdmsmith.com <br />Martin Lewis, P.E., BCEE <br />Construction/Project Manager <br />CDM Smith, Inc. <br />1701 Florida AIA #301 <br />Vero Beach, Florida 32963 <br />Subject: <br />Project: Indian River County Landfill Segment 3 Cell 2 Expansion, Segment 2 Partial Closure, And <br />Landfill Gas System Expansion. <br />West Slope Toe Drain <br />Dear Mr. Lewis, <br />In response to the Request for Proposal received on February 7, 20.19, Thalle is pleased to present this <br />proposal for furnishing all labor, equipment, materials and incidentals to perform the additional work for <br />placing a toe drain on the west slope. It is to be noted that the toe drain to be installed is quoted with pipe <br />and geotextile only. The installation of rock is not included in this proposal. If it is found that rock needs <br />to be installed, Thalle will provide an additional cost for installing the rock. <br />The total price for the additional work requested by CDM Smith $12,236.97 (twelve thousand two <br />hundred thirty-six thousand dollars and ninety-seven cents). <br />Attached to this letter is the breakdown of the $12,236.97 (twelve thousand two hundred thirty-six <br />thousand dollars and ninety-seven cents). <br />For this additional work Thalle is requesting 4 days in contract time extension. <br />Find attached the price breakdown. <br />If you have any further questions or concerns, do not hesitate to contact me. <br />Sincerely, <br />einaldo Gonzalez, PM <br />Thalle Construction <br />cc. Chris Haverstrom P.E. , Thalle <br />Himanshu H. Mehta P.E. , IRC <br />Dan Lauth, CDM Smith <br />Amy M. Hightower, P.E. , CDM Smith <br />900 NC Highway 86 i lnrfh, I li!Ishoroodh, NC 2727/j ! c>ftc. '219.245,1490 (u;:: 919.241.1659 I r.vr,v.lhcrllc ,-:;m <br />
The URL can be used to link to this page
Your browser does not support the video tag.