Laserfiche WebLink
Director Davis clarified that staff's recommendation was to <br />have the larger poles go in at this time allowing the opportunity <br />for the future streetlighting. The cost would be $1,260 per year <br />to upgrade to the larger poles. <br />Commissioner Bird observed that unless we plan to commit to <br />lights in the future, there would be no use in upgrading the poles. <br />He asked Director Davis if he believed it would be desirable <br />sometime in the future to light the street. <br />Director Davis responded that as development increases along <br />the corridor it certainly would be desirable, and it would be <br />necessary to have the larger poles in order for the streetlighting <br />to be effective. <br />Commissioner Bird asked if there was an opportunity and what <br />a one-time cost for the poles would be, and Director Davis advised <br />that he would get the cost from the City. <br />ON MOTION by Commissioner Bird, SECONDED by <br />Commissioner Adams, the Board unanimously (4- <br />0, Commissioner Eggert absent) DEFERRED the <br />item for a week to allow Director Davis to <br />obtain information from the City of Vero Beach <br />for the one-time cost of the pole upgrade. <br />51 <br />December 13, 1994 <br />BOOK 93 PAGE: J 14 <br />