My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-003
CBCC
>
Official Documents
>
1980's
>
1987
>
1987-003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2019 11:45:08 AM
Creation date
4/5/2019 11:43:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/06/1987
Control Number
87-03
Entity Name
Grand Harbor Estuary System
Subject
Agreement RE Maintenance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All contractors will, through contract documents, be made to <br />take responsibility for following the marsh protection practices <br />which shall include but not be limited to: no movement of heavy <br />equipment through vegetated marsh areas except as designated as <br />limited access routes; no deposition of spoil material on the <br />marsh surface to a thickness greater than two inches; and, the <br />restoration of any damaged vegetation to the original DER <br />specifications. <br />The responsibility for performing the work will be undertaken <br />by the Developer for transfer to the master association to be <br />known as the Grand Harbor Property Owners Association, Inc. which <br />Will take ownership of all common areas including the <br />rehabilitated and created marsh areas. Maintenance funding will <br />be provided through Association dues.' <br />Reference: Daiber, Franklin C., CONSERVATION OF TIDAL MARSHES, <br />Van Nostrand Reinhold, 1986, ISDN 0-442-24873-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.