Laserfiche WebLink
PRELIMINARY COST ESTIMATE FOR <br />128TH COURT (236 L.F. NW OF 79TH AVENUE) <br />PROJECT 9121 <br />1. <br />ENGINEERING <br />$611.24 <br />Based on $2.59/LF <br />2. <br />CONSTRUCTION <br />$7,764.90 <br />SUB -TOTAL <br />$8,376.14 <br />3. <br />ADMINISTRATION <br />$252.54 <br />3.014M6% OF <br />ENGINEERING <br />& CONSTRUCTION <br />4. <br />2% TAX COLLECTORS <br />FEE (ENGINEERING <br />$167.52 <br />& CONSTRUCTION) <br />5. <br />PERMIT FEES <br />$300.00 <br />6. <br />RECORDING FEE <br />$43.50 <br />SUB -TOTAL <br />TOTAL COST OF PROJECT <br />Cost paid by Mr. Kirric <br />Cost paid by County <br />9121 EST.WK1 <br />$9,139.70 <br />$5,143.92 <br />$3,995.78 <br />TOTAL L.F. <br />TOTAL F.F. <br />$9,139.70 <br />236 <br />332 <br />