Laserfiche WebLink
Work Order No. 8 <br />69th Street Milling & <br />Resurfacing Project <br />EXHIBIT C — TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to take approximately nine (9) months from the Notice to Proceed (NTP). <br />NTP contingent upon BOCC approval <br />Initial Submittal (40% Design Drawings) 5 months following NTP <br />Interim Submittal (80% Design Drawings) 7 months following NTP <br />Final Submittal (100% Design Drawings) 9 months following NTP <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />Page 6 of 7 <br />