My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/12/2019 (2)
CBCC
>
Meetings
>
2010's
>
2019
>
03/12/2019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 12:03:42 PM
Creation date
4/17/2019 2:30:48 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/12/2019
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ABCO Garage Door Company, Inc. <br />670 8th Court <br />Vero Beach, Florida 32962 <br />Tel# (772) 567-9098 <br />Email: abcodoorvb@outlook.com <br />Customer/Billing Information <br />Central Waste Water Facility <br />3550 49th Street <br />Veroi Beach, Florida 32967 <br />ESTIMATE. <br />Date <br />Estimate # <br />3/4/2019 <br />143858I <br />Ship To/Project <br />Dumpster Area <br />3550 49th Street <br />Vero Beach, Florida 32967 <br />Kevin Gibson 0 #770-5244 <br />Item <br />Description <br />Qty <br />Cost <br />Total <br />10' W x 12' H DCC-INS+5... <br />10' W x 12' H Cornell ESD20 Commercial Rolling <br />2 <br />19,967.50 <br />39,935.00 <br />Stainless Steel Insulated Slat Door Insulated R -Value <br />9.0, Hood Cover Stainless Steel, NOA# 18-0125.09 50 <br />PSF Dade County Impact Rated, Block Mount, <br />Right -Hand Mount PRO -GH Micanan 7/9 Explosion <br />. <br />Proof 3 Phase w/Safety Edge, Inside Lock, Installed, <br />Tear Down & Disposal. <br />Permit - Engineering Letter <br />Engineering Letter - Required On Commercial <br />1 <br />475.00 <br />475.00 <br />Application. <br />Permit - Indian River <br />Indian River County Commercial Permit & Processing <br />1 <br />280.00 <br />280.00 <br />Fee - All Inspections Must Be Completed Within 180 <br />• <br />Days From Permit Issue Date.. <br />NOC <br />Notice Of Commencement - Requires Original <br />1 <br />20.00 <br />20.00 <br />Signature. <br />*Special Order 3 - 4 Weeks* <br />Total <br />Customer Signature: <br />Page 1 <br />Date: <br />111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.