My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-046B1
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-046B1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:19:51 PM
Creation date
4/24/2019 11:13:42 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/26/2019
Control Number
2019-046B1
Agenda Item Number
8.E.
Entity Name
Jones’ Pier Fruit Stand Replica
Subject
Award Bid 2019042 to Indian River Docks, LLC.
Bid Number
2019042
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2019042 Jones Pier Fruit Stand <br />Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) <br />and Indian River Docks, LLC <br />(hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants <br />hereinafter set forth, agree as follows: <br />ARTICLE 1- WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is <br />generally described as follows: <br />Site preparation and construction of a fruit stand based on the Architectural Plans and Engineering <br />Drawings included as part of the bid package. <br />ARTICLE 2 - THE PROJECT <br />The Project for which the Work under the Contract Documents may be the whole or only a part is <br />generally described as follows: <br />Project Name: Jones Pier Fruit Stand Replica Construction <br />Bid Number: 2019042 <br />Project Address: 7700 Jungle Trail, Vero Beach, FL 32963 <br />ARTICLE 3 - CONTRACT TIMES <br />3.1 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for <br />final payment as stated in the specifications are of the essence of the Agreement. <br />3.2 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be completed and ready for final payment on or before June 15, 2019. <br />ARTICLE 4 - CONTRACT PRICE <br />4.1 OWNER shall pay CONTRACTOR for completion of the Work an amount in current funds equal to <br />the sum of the amounts determined pursuant to paragraph 4.01.A and summarized in paragraph <br />4.01.B, below: <br />A. For all Work, at the prices stated in CONTRACTOR's Bid, attached hereto as an exhibit. <br />B. THE CONTRACT SUM subject to additions and deductions provided in the Contract Documents: <br />Page 21 of 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.