My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-066
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:02:43 PM
Creation date
4/24/2019 4:52:17 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/23/2019
Control Number
2019-066
Agenda Item Number
8.C.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order Number 10
8th Street and Indian River Blvd Signalization-Mast Arms
Project Number
IRC-1909
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. 10 <br />8th Street & Indian River <br />Blvd - Mast Arm <br />Signalization Sheets, Opinion of Probable Construction Cost and other detail sheets as <br />necessary to produce the construction bid plans. <br />The following additional data shall be utilized for development of the plans: <br />1. The roadway plans sheets will be drawn at a scale of 1" = 40' prepared on 11" x <br />17" sheets. <br />2. Plan sheets shall depict existing right-of-way, section lines, property lines, <br />temporary construction easements, and centerline of construction. Horizontal <br />control points with state plane coordinates for all PC's, PT's, curve radius, curve <br />length and horizontal PI's shall be included on the Plan or summarized in an <br />alignment table. <br />3. Signing and Pavement Markings will be included within the Construction <br />Documents. All signing and pavement markings are to be prepared in accordance <br />with the latest design standards and practices (MUTCD), FDOT Standard <br />Specifications, Indexes, and COUNTY standards. <br />4. Plans shall include spot grades adequate to describe any proposed grading. <br />5. Match lines shall not be located within the limits of an intersection. <br />6. If applicable, soil boring information shall be plotted on cross sections with soil <br />classification and high season water table. <br />7. All quantities shall reference FDOT Pay Item Numbers. <br />8. All details shall reference FDOT Index Numbers, where applicable. <br />9. All specifications shall reference the FDOT Specifications for Road and Bridge <br />Construction. Any deviations or special specifications not included in FDOT <br />Specifications will be provided in the Technical Specifications. <br />10. Initial (40% completion), interim (80% completion) and Final Plan (100% <br />completion) Submittal shall include the following: <br />i. Three (3) Sets Plans. <br />ii. One (1) Opinion of Probable Construction Cost <br />iii. One (1) CD with drawings in PDF format. <br />Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.