My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-033
CBCC
>
Resolutions
>
2010's
>
2019
>
2019-033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2019 12:35:25 PM
Creation date
4/25/2019 2:43:14 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
2019-033
Approved Date
04/23/2019
Agenda Item Number
8.H.
Resolution Type
Small County Outreach Program (SCOP) Agreement
Entity Name
Florida Department of Transportation (FDOT)
Subject
Chairman's Execution
Resurfacing and Construction Engineering Inspection (CEI) Services
Includes State-Funded Grant Agreement
Area
49th Street/Lindsay Road from 58th Avenue/CR-613 to 31st Avenue
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID'. 01899E69-0508-47AA-8D43-72282BC6EBA9 <br />STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525-010$0 <br />STATE -FUNDED GRANT AGREEMENT PROGRAM MANAGEM09N7 <br />Page 1 of 1 <br />EXHIBIT "A" <br />PROJECT DESCRIPTION AND RESPONSIBILITIES <br />FPN: 436850-1-54-01 <br />This exhibit forms an integral part of the State -Funded Grant Agreement between the State of Florida, Department of <br />Transportation and <br />INDIAN RIVER COUNTY (the Recipient) <br />PROJECT LOCATION: <br />❑ The project is on the National Highway System. <br />❑ The project is on the State Highway System. <br />PROJECT LENGTH AND MILE POST LIMITS: 1.748 MILES, 49TH STREET FROM 58TH AVE. TO 31ST AVE. <br />PROJECT DESCRIPTION: RESURFACING 49TH STREET (LINDSEY RD) FROM 58TH AVE. (CR -613) TO 31ST AVE. <br />The proposed improvement will include Construction and CEI, milling of existing pavement, installation of superpave <br />asphaltic, sodding and installation of thermoplastic pavement markings. <br />SPECIAL CONSIDERATIONS BY RECIPIENT: <br />The Agency is required to provide a copy of the design plans for the Department's review and approval to coordinate <br />permitting with the Department, and notify the Department prior to commencement of any right-of-way activities. <br />The Recipient shall commence the project's activities subsequent to the execution of this Agreement and shall perform in <br />accordance with the following schedule: <br />a) Construction to be completed by November 30, 2020. <br />If this schedule cannot be met, the Recipient will notify the Department in writing with a revised schedule or the project is <br />subject to the withdrawal of funding. <br />SPECIAL CONSIDERATIONS BY DEPARTMENT: <br />
The URL can be used to link to this page
Your browser does not support the video tag.