Laserfiche WebLink
SECTION 00948 = Work Change Directive <br />No. <br />DATE OF ISSUANCE: EFFECTIVE DATE: <br />OWNER: Indian River County <br />CONTRACTOR: <br />Project: OLD DIXIE HIGHWAY AND HIGHLAND DRIVE INTERSECTION IMPROVEMENTS <br />OWNER's Project No. IRC -1362 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in Method of determining change in <br />Contract Prices Contract Times <br />ID Unit Prices <br />O Lump Sum <br />❑ Other: <br />D By Change Order: <br />❑ Contractor's Records <br />❑ Engineer's Records <br />❑ Other: <br />❑ By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated If the change involves an increase, the estimated <br />amount is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACCEPTED: <br />By: <br />RECOMMENDED: <br />By: <br />APPROVED: <br />By: <br />CONTRACTOR (Signature) <br />Date: <br />ENGINEER (Signature) <br />Date: <br />OWNER (Signature) <br />Date: <br />**END OF SECTION** <br />00948 - Work Change Directive Rev 06-201313 <br />00948-1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1362-Old Dixie Hwy_Highland Dr\1-Admin\Bid DocumentsWaster Contract <br />Documents\00948 - Work Change Directive Rev 06-2013.doc <br />