My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-061A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-061A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:38:11 PM
Creation date
4/26/2019 1:10:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-060A
Agenda Item Number
8.D.
Entity Name
Vero Beach Roofing
Subject
Reverse Osmosis Plant Roof Replacement
Area
North Reverse Osmosis Plant
Project Number
IRC-1802
Bid Number
2019031
Alternate Name
RO Plant
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.02 All questions about the meaning or intent of the Bidding Documents are to be <br />submitted to PURCHASING (purchasing c(�.ircgov.com) in writing. Interpretations or clarifications <br />considered necessary by ENGINEER in response to such questions will be issued by Addenda <br />mailed or delivered to all parties through the Issuing Office as having received the Bidding <br />Documents. Questions received less than ten days prior to the date for opening of Bids may not <br />be answered. Only questions answered by Addenda will be binding. Oral and other <br />interpretations or clarifications will be without legal effect. <br />7.03 Addenda may be issued to clarify, correct, or change the Bidding Documents as <br />deemed advisable by OWNER or ENGINEER. <br />ARTICLE 8 - BID SECURITY <br />8.01 Each Bid must be accompanied by Bid Security made payable to OWNER in the <br />amount of five percent of the Bidder's maximum base bid price and in the form of a certified <br />check; cashier's check; or an AIA Document A310 Bid Bond issued by a surety meeting the <br />requirements of Paragraph 5.01 of the General Conditions. The Bid Bond shall be executed by <br />such sureties as are named in the current list of "Companies Holding Certificates of Authority as <br />Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in <br />Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. <br />Department of the Treasury. The Surety must be authorized to issue surety bonds in Florida. <br />The Bidder shall require the attorney-in-fact who executes any Bond, to affix to each a current <br />certified copy of their Power of Attorney, reflecting such person's authority as Power of Attorney <br />in the State of Florida. Further, at the time of execution of the Contract, the Successful Bidder <br />shall for all Bonds, provide a copy of the Surety's current valid Certificate of Authority issued by <br />the United States Department of the Treasury under 31 United States Code sections 9304- <br />9308. The Surety shall also meet the requirements of paragraphs 5.01 and 5.02 of the General <br />Conditions. <br />8.02 The Bid security of the Successful Bidder will be retained until such Bidder has <br />executed the Contract Documents, fumished the required contract security and met the other <br />conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful <br />Bidder fails to execute and deliver the Contract Documents and fumish the required contract <br />security within 15 days after the Notice of Award, OWNER may annul the Notice of Award and the <br />Bid security of that Bidder will be retained by the owner. The Bid Security of other Bidders whom <br />OWNER believes to have a reasonable chance of receiving the award may be retained by <br />OWNER until the earlier of seven days after the Effective Date of the Agreement or 91 days after <br />the Bid opening, whereupon Bid Security fumished by such Bidders will be returned., <br />8.03 Bid Security of other Bidders whom OWNER believes do not have a reasonable <br />chance of receiving the award will be returned within seven days after the Bid opening. <br />ARTICLE 9 - CONTRACT TIMES <br />9.01 The number of calendar days within which, or the dates by which, the Work is to be (a) <br />Substantially Completed and (b) also completed and ready for final payment are set forth in the <br />Agreement. <br />00200 - Instructions to Bidders REV 04-07 <br />. 00200 - 5 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1362-OId Dixie Hwy_Highland Dr\1-Admin1Bid Documents\Master Contract Documents\00200 - Instructions to Bidders . <br />REV 04-07.doc Rev. 05/01 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.