My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-061A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-061A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:38:11 PM
Creation date
4/26/2019 1:10:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-060A
Agenda Item Number
8.D.
Entity Name
Vero Beach Roofing
Subject
Reverse Osmosis Plant Roof Replacement
Area
North Reverse Osmosis Plant
Project Number
IRC-1802
Bid Number
2019031
Alternate Name
RO Plant
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01220 <br />PROGRESS MEETINGS <br />1.1 SCOPE <br />A. Date and Time: <br />1. Regular Meetings: As mutually agreed upon by ENGINEER and <br />CONTRACTOR. <br />2. Other Meetings: On call. <br />B. Place: CONTRACTOR'S office at Project site or other mutually agreed upon <br />location. <br />C. ENGINEER shall prepare agenda, preside at meetings, and prepare and <br />distribute a transcript of proceedings to all parties. <br />D. CONTRACTOR shall provide data required and be prepared to discuss all items <br />on agenda. <br />1:2 MINIMUM ATTENDANCE <br />A. CONTRACTOR <br />B. SUBCONTRACTOR: <br />When needed for the discussion of a particular agenda item, CONTRACTOR <br />shall require representatives of Subcontractors or suppliers to attend a meeting. <br />C. CONSTRUCTION COORDINATION MANAGER <br />D. OWNER'S representative, if required. <br />E. Utility Representatives <br />F. Others as appropriate. <br />G. Representatives present for each party shall be authorized to act on their behalf. <br />1.3 AGENDA <br />Agenda will include, but will not necessarily be limited to, the following: <br />1. Transcript of previous meeting. <br />2. Progress since last meeting. <br />3. Planned progress for next period. <br />4. Problems, conflicts and observations. <br />5. Change Orders. <br />6. Status of Shop Drawings. <br />7. Quality standards and control. <br />8. Schedules, including off-site fabrication and delivery schedules. Corrective <br />measures, if required. <br />9. Coordination between parties. <br />10. Safety concerns. <br />11. Other business. <br />+ + END OF SECTION + + <br />01220-1 01220 Progress Meetings <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1362-OId Dixie Hwy Highland Dr\1-Admin\Bid Documents'Master Contract Documents\01220 - <br />Progress Meetings.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.