My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-061A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-061A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:38:11 PM
Creation date
4/26/2019 1:10:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-060A
Agenda Item Number
8.D.
Entity Name
Vero Beach Roofing
Subject
Reverse Osmosis Plant Roof Replacement
Area
North Reverse Osmosis Plant
Project Number
IRC-1802
Bid Number
2019031
Alternate Name
RO Plant
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01340 <br />SUBMITTAL OF SHOP DRAWINGS <br />equipment which is fabricated or delivered prior to the approval of Shop <br />Drawings. Materials or equipment requiring Shop Drawings which have <br />not yet received approval by the ENGINEER shall not be installed on the <br />project. Materials or equipment will not be included in periodic progress <br />payments until approval thereof has been obtained in the specified <br />manner. <br />P. ENGINEER will review and process all submittals promptly, but a <br />reasonable time should be allowed for this, for the Shop Drawings being <br />revised and resubmitted, and for time required to return the approved <br />Shop Drawings to CONTRACTOR. <br />Q. Furnish required submittals with complete information and accuracy in <br />order to achieve required approval of an item within three submittals. All <br />costs to ENGINEER involved with subsequent submittals of Shop <br />Drawings, Samples or other items requiring approval, will be back -charged <br />to CONTRACTOR in accordance with the General Conditions and the <br />Supplementary Conditions. If the CONTRACTOR requests a substitution <br />for a previously approved item, all of ENGINEER'S costs in the reviewing <br />and approval of the substitution will be back -charged to CONTRACTOR <br />unless the need for such substitution is beyond the control of <br />CONTRACTOR. <br />+ + END OF SECTION + + <br />01340 - Submittal of Shop Drawings <br />01340-6 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1362-OId Dixie Hwy_Highland Dr\1-Admin\Bid Documents\Master Contract Documents \01340 <br />- Submittal of Shop.Drawings.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.