My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-061A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-061A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:38:11 PM
Creation date
4/26/2019 1:10:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-060A
Agenda Item Number
8.D.
Entity Name
Vero Beach Roofing
Subject
Reverse Osmosis Plant Roof Replacement
Area
North Reverse Osmosis Plant
Project Number
IRC-1802
Bid Number
2019031
Alternate Name
RO Plant
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br />PROTECTION OF THE WORK AND PROPERTY <br />1.1 GENERAL <br />A. CONTRACTOR shall be responsible for taking all precautions, providing all <br />programs, and taking all actions necessary to protect the Work and all public <br />and private property and facilities from damage as specified in the General <br />Conditions and herein. <br />B. In order to prevent damage, injury or Toss, CONTRACTOR'S actions shall <br />include, but not be limited to, the following: <br />1. Store apparatus, materials, supplies, and equipment in an orderly, safe <br />manner that will not unduly interfere with the progress of the Work or the <br />Work of any other Contractor or utility service company. <br />2. Provide suitable storage facilities for all materials, which are subject to injury <br />by exposure to weather, theft, breakage, or otherwise. <br />3. Place upon the Work or any part thereof, only such loads as are consistent <br />with the safety of that portion of the Work. <br />4. Clean up frequently all refuse, rubbish, scrap materials, and debris caused <br />by construction operations, so that at all times, the site of the Work presents <br />a safe, orderly, and workmanlike appearance. <br />5. Provide barricades and guard rails around openings, for scaffolding, for <br />temporary stairs and ramps, around excavations, elevated walkways and <br />other hazardous areas. <br />C. Except after written consent from proper parties, do not enter or occupy <br />privately -owned land with men, tools, materials or equipment, except on <br />easements provided herein. <br />D. Assume full responsibility for the preservation of all public and private property or <br />facility on or adjacent to the site. If any direct or indirect damage is done by or <br />on account of any act, omission, neglect or misconduct in the execution of the <br />Work by the CONTRACTOR, it shall be restored by the CONTRACTOR, at its <br />expense, to a condition equal to or better than that existing before the damage <br />was done. <br />1.2 BARRICADES AND WARNING SIGNALS <br />CONTRACTOR's responsibility for the maintenance of barricades, signs, lights, and <br />for providing watchmen shall continue until OWNER accepts the Project. <br />01541-1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1362-OId Dixie Hwy Highland Dr\1-Admin\Bid Documents\Master Contract <br />Documents\01541 - Protection of Property.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.