My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-061A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-061A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:38:11 PM
Creation date
4/26/2019 1:10:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-060A
Agenda Item Number
8.D.
Entity Name
Vero Beach Roofing
Subject
Reverse Osmosis Plant Roof Replacement
Area
North Reverse Osmosis Plant
Project Number
IRC-1802
Bid Number
2019031
Alternate Name
RO Plant
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION _01630 <br />SUBSTITUTIONS <br />1.1 GENERAL <br />A. Requests for review of a substitution shall conform to the requirements of <br />Article 6.05, "Substitutes and Or -Equals," of the General Conditions, and shall <br />contain complete data substantiating compliance of the proposed substitution <br />with the Contract Documents. <br />1.2 CONTRACTOR'S OPTIONS <br />A. For materials or equipment (hereinafter products) specified only by reference <br />standard, select product meeting that standard by any manufacturer, fabricator, <br />supplier or distributor (hereinafter manufacturer). To the maximum extent <br />possible, provide products of the same generic kind from a single source. <br />B. For products specified by naming several products or manufacturers, select any <br />one of the products or manufacturers named which complies with Specifications. <br />C. For products specified by naming one or more products or manufacturers and <br />stating "or equivalent," submit a request for a substitution for any product or <br />manufacturer which is not specifically named. <br />D. For products specified by naming only one product or manufacturer and followed <br />by words indicating that no substitution is permitted, there is no option and no <br />substitution will be allowed: <br />E. Where more than one choice is available as a CONTRACTOR's option, select <br />product which is compatible with other products already selected or specified. <br />1.3 SUBSTITUTIONS <br />A. During a period of 15 days after date of commencement of Contract Time, <br />ENGINEER will consider written requests from CONTRACTOR for substitution of <br />products or manufacturers, and construction methods (if specified). <br />1. After end of specified period, requests will be considered only in case of <br />unavailability of product or other conditions beyond control of <br />CONTRACTOR. <br />B. Submit 5 copies of Request for Substitution. Submit a separate request for each <br />substitution. In addition to requirements set forth in Article 6.05 of General <br />Conditions, include in the request the following: <br />1. For products or manufacturers: <br />a. Product identification, including manufacturer's name and address. <br />b. Manufacturer's literature with product description, performance and <br />test data, and reference standards. <br />01630-1 01630 Substitutions <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1362-OId Dixie Hwy_Highland Dr\1-Admin\Bid Documents\Master Contract <br />Documents\01630 - Substitutions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.