My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-061A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-061A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:38:11 PM
Creation date
4/26/2019 1:10:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-060A
Agenda Item Number
8.D.
Entity Name
Vero Beach Roofing
Subject
Reverse Osmosis Plant Roof Replacement
Area
North Reverse Osmosis Plant
Project Number
IRC-1802
Bid Number
2019031
Alternate Name
RO Plant
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01630 <br />SUBSTITUTIONS <br />4. If the substitution requires a more extensive review, Engineer will <br />proceed with the review only after CONTRACTOR has agreed to <br />reimburse Owner for the review cost. <br />5. Engineer may require CONTRACTOR to furnish at CONTRACTOR's <br />expense additional data about the proposed substitute. <br />H. Any redesign of structural members shall be performed by, and the plans signed <br />and sealed by, a Professional Engineer registered in the State of Florida. The <br />redesign shall be at the CONTRACTOR's expense. Any redesign will require an <br />extensive review by the Engineer. The CONTRACTOR must agree to reimburse <br />the Owner for the review cost prior to the Owner's Engineer proceeding with the <br />design review. The ENGINEER's estimated cost of review shall be provided to <br />the CONTRACTOR prior to proceeding with the review to allow the <br />CONTRACTOR the opportunity to rescind the request. <br />I. Engineer will be allowed a reasonable time within which to evaluate each <br />proposed substitution. Engineer will be the sole judge of acceptability and shall <br />have the right to deny use of any proposed substitution. The CONTRACTOR <br />shall not order, install, or utilize any substitution without either an executed <br />Change Order or Engineer's notation on the reviewed shop drawing. Owner may <br />require CONTRACTOR to furnish at CONTRACTOR's expense a special <br />manufacturer's performance guarantee(s) or other surety with respect to any <br />substitute and an indemnification by the CONTRACTOR. ENGINEER will record <br />time required by Engineer and Engineer's consultants in evaluating substitutions <br />proposed by CONTRACTOR and in making changes in the Contract Documents <br />occasioned thereby. Whether or not a proposed substitute is sued, <br />CONTRACTOR shall reimburse Owner for the charges of Engineer and <br />Engineer's consultants for evaluating each proposed substitute. <br />J. Substitute materials or equipment may be proposed for acceptance in <br />accordance with this Section. In the 'event that substitute materials or equipment <br />are used and are less costly than the originally specified material or equipment, <br />than the net difference in cost shall benefit the Owner and CONTRACTOR in <br />equal proportions. This cost difference shall not be reduced by any failure of the <br />CONTRACTOR to base his bid on the named materials or equipment. <br />++END OF SECTION ++ <br />01630-3 01630 Substitutions <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1362-OId Dixie Hwy Highland Dr\1-Admin\Bid Documents\Master Contract <br />Documents \01630 - Substitutions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.