My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-061A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-061A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:38:11 PM
Creation date
4/26/2019 1:10:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-060A
Agenda Item Number
8.D.
Entity Name
Vero Beach Roofing
Subject
Reverse Osmosis Plant Roof Replacement
Area
North Reverse Osmosis Plant
Project Number
IRC-1802
Bid Number
2019031
Alternate Name
RO Plant
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01820 <br />POST FINAL INSPECTION <br />1.1 GENERAL <br />A. Approximately one year after Final Completion, the OWNER will make <br />arrangements with the Construction Coordination Manager and the <br />CONTRACTOR for a post final inspection and will send a written notice to said <br />parties to inform them of the date and time of the inspection. <br />B. Corrections of defective work noted by OWNER and Construction Coordination <br />Manager shall comply with the applicable sections of Article 13, General <br />Conditions. <br />C. After the inspection, the OWNER will inform the CONTRACTOR of any <br />corrections required to release the performance and payment bonds. <br />001820 - Post Final Inspection rev 05-13 <br />001820 1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1362-0Id Dixie Hwy_Highland Dr11-Admin\Bid Documents \Master Contract Documents1001820 - Post Final Inspection <br />rev 05-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.