My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-061A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-061A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:38:11 PM
Creation date
4/26/2019 1:10:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-060A
Agenda Item Number
8.D.
Entity Name
Vero Beach Roofing
Subject
Reverse Osmosis Plant Roof Replacement
Area
North Reverse Osmosis Plant
Project Number
IRC-1802
Bid Number
2019031
Alternate Name
RO Plant
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the County may direct the Contractor to remove the material and replace it with <br />Granular Base Material meeting the requirements of these specifications. <br />5. Basis of Payment <br />a. Mobilization for Reclaiming: No payment for mobilization shall be due for <br />returning the equipment to the site when it has been removed and returned for the <br />Contractor's own purposes or because of breakdowns and repairs, weather delays, <br />labor problems, accidents, or the like, or when work has been resumed after being <br />stopped by the County because of unsatisfactory materials, equipment, or <br />performance. Payment for Mobilization shall be Lump Sum for the project. <br />b. Reclaimed Asphalt Base: In place and accepted, shall be paid for at the contract <br />unit price per square meter or square yard, as indicated in the Bid Sheet. The area <br />of work for the purpose of payment shall be the overall length of each reclaimed <br />lane times the specified total base width for the lane. The total base width shall <br />include the widening width, if any, in which the reclaimer is to be used to blend new <br />base material with the pulverized layers. Payment under this item shall be full <br />compensation for all work included in or incidental to the reclaiming operation, for <br />the grading, shaping, and compacting of the Reclaimed Asphalt Base, for the mix <br />design study, for furnishing, delivering, and applying water, for applying and mixing <br />and furnishing asphalt emulsion or other stabilizing agent as specified, and for all <br />other work and material incidental to the reclaiming operation. <br />Completed Base Course Testing — The Contractor shall perform a minimum of 8 <br />tests of the completed base course to verify that the completed base course meets <br />the specified minimum Structural Number of 1.8. Test locations shall be determined <br />by the County. In the event that the minimum Structural Number is not achieved, the <br />County may require corrective action, including the placement of additional asphalt <br />structural course at the expense of the Contractor. <br />c. Payment for Granular Base Material: This is included in the cost of the Reclaimed <br />Asphalt Base. The Contractor shall determine how much if any granular base is <br />required and shall include the cost for granular base in the cost of the Reclaimed <br />asphalt base. <br />d. Asphalt Emulsion: Emulsified asphalt, type CSS -1h, shall be uniformly <br />incorporated in the layer at the rate specified by the Mix Design. Payment is in <br />gallons of Asphalt Emulsion Type CSS -1 h. <br />e. Manholes: Each manhole shall be protected during the reclamation process. After <br />final pass of reclaimer and final compaction, manholes shall be adjusted to the <br />appropriate height to accommodate the asphalt overlay finish grade. <br />f. Water Shutoffs: Water shutoffs and other valves or shutoffs shall be protected <br />during the reclamation process. After final pass of reclaimer and final compaction, <br />water shutoffs and other valves and shutoffs shall be adjusted to the appropriate <br />height to accommodate the asphalt overlay finish grade. <br />g. Material/Removal: Material shall be removed from the roadway area in order to <br />prepare for a desired final grade or removal of unsuitable material. Approximately 2- <br />1/2" removal shall be required off the top after initial pulverization. All suitable <br />material shall be utilized in the asphalt pavement base course. <br />01025-20 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1362-OId Dixie Hwy Highland Dr\1-Admin\Bid Documents\Master Contract <br />Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.