Laserfiche WebLink
stand of grass. Two applications of fertilizer will be required with the initial <br />application being fertilizer and the second application being "weed and feed". <br />C. Guarantee: All sodded areas shall be guaranteed for one year after date of final <br />acceptance. <br />Replacement of Defective Sod: Any dead sod or sod showing (less than 95% of a <br />square) indication of probable non survival or lack of health and vigor, or which do <br />not exhibit the characteristics to meet specifications, shall be replaced within two <br />weeks of notice from Owner or Engineer. All replacement sod shall be <br />furnished/installed at no additional cost to the Owner and shall be guaranteed for <br />three months. All replacement shall meet original specifications. <br />The Contractor shall notify the Owner and Engineer ten days prior to the end of the <br />guarantee period and such guarantee shall be extended until notification is <br />received. <br />At the end of the guarantee period, all sod that is dead or in unsatisfactory growth <br />shall be replaced within two weeks. <br />D. Fertilizer: Commercial fertilizers shall comply with the Indian River County Fertilizer <br />Ordinance 2013-012 and Supplement Ordinance 2013-014 (see Appendix B). <br />E. Water for Grassing: Contractor shall provide the water used in the sodding <br />operations as necessary to meet the requirements of Article 570-3.6. <br />F. Preparation of Ground: The area over which the sod is to be placed shall be <br />scarified or loosened to a depth and then raked smooth and free from debris. <br />Where the soil is sufficiently loose and clean, the Owner, at his discretion, <br />may authorize the elimination of ground preparation. <br />G. Application of Fertilizer: Before applying fertilizer, the soil pH shall be brought to a <br />range of 6.0 - 7.0. <br />Contractor shall apply two (2) applications. The initial shall be fertilizer and the <br />second application shall be "weed and feed". <br />The fertilizer shall be spread uniformly over the sodded area at the rate of 436 <br />pounds per acre, or 10 pounds per 1,000 square feet, by a spreading device <br />capable of uniformly distributing the material at the specified rate. <br />Contractor shall apply applications as per manufacturer's specification. All tickets <br />from bags shall be handed over to the County Inspector. <br />On steep slopes, where the use of a machine for spreading or mixing is not <br />practicable, the fertilizer shall be spread by hand and raked in and thoroughly mixed <br />with the soil to a depth of approximately 2 inches. <br />H. Placing Sod: The sod shall be placed on the prepared surface, with edges in close <br />contact and shall be firmly and smoothly embedded by light tamping with <br />appropriate tools. <br />Where sodding is used in drainage ditches, the setting of the pieces shall be <br />staggered so as to avoid a continuous seam along the line of flow. Along the edges <br />of such staggered areas, the offsets of individual strips shall not exceed 6 inches. In <br />order to prevent erosion caused by vertical edges at the outer limits, the outer <br />pieces of sod shall be tamped so as to produce a featheredge effect. <br />Where sodding is placed abutting paved shoulder, the contractor is to ensure that <br />01025-24 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1362-OId Dixie Hwy Highland Dr\1-Admin\Bid Documents\Master Contract <br />Documents\Technical Specifications.doc <br />