Laserfiche WebLink
• <br />The determination of the appropriate method(s) of compliance is the complete and sole <br />responsibility of the BIDDER. Such methods will not be checked by the OWNER or <br />ENGINEER for accuracy, completeness or any other purpose. The OWNER and <br />ENGINEER shall have no responsibility to review or check the B1DDER's compliance <br />with the Trench Safety Standards, <br />8. The BIDDER, in submitting this bid, represents that it has obtained and considered all <br />available geotechnical information, has utilized said geotechnical information and that, <br />based on such information and the BIDDER's own information, the BIDDER has <br />sufficient knowledge of the Project's surface and subsurface site conditions and <br />characteristics to assure BIDDER's compliance with the applicable Trench Safety <br />Standards in designing the trench safety system(s) for the Project. <br />BIDDER:�� <br />By: Timothy Rose <br />Position or Title: President <br />Date: 03.13.19 <br />STATE OF Florida <br />COUNTY OF Indian River <br />Personally appeared before me, the undersigned authority, Timothy Rose <br />who after first being sworn by me, affixed his/her signature in the space provided above on this <br />13th day of March , 20 19 . <br />NotaryiPubli , Sate at large <br />My Comm�niss n Expires: <br />1• <br />DEBORAH 'WEST fn <br />COMMISSi0N r FF904573 <br />EXPIRES: Octobi 03, 2019 <br />** END OF SECTION** <br />00454 - Honda Trench Safety Act - REV 04-07 <br />00454 - 2 <br />F:\Public WorksIENGINEERING DIVISION PROJECTS11362-OId Dixie Hvry_Highland Drit-Admin\Bid DocumentslMasier Con racl Documenls100454 - Florida Trench Safely <br />Act - REV 04-07 doc <br />