My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-061A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-061A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:38:11 PM
Creation date
4/26/2019 1:10:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-060A
Agenda Item Number
8.D.
Entity Name
Vero Beach Roofing
Subject
Reverse Osmosis Plant Roof Replacement
Area
North Reverse Osmosis Plant
Project Number
IRC-1802
Bid Number
2019031
Alternate Name
RO Plant
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br />Title Page <br />ARTICLE 1 - DEFINITIONS AND TERMINOLOGY 5 <br />1.01 Defined Terms 5 <br />1.02 Terminology 7 <br />ARTICLE 2 - PRELIMINARY MATTERS 8 <br />2.01 Delivery of Bonds 8 <br />2.02 Copies of Documents 8 <br />2.03 Commencement of Contract Times; Notice to Proceed 8 <br />2.04 Starting the Work 8 <br />2.05 Before Starting Construction 8 <br />2.06 Preconstruction Conference 9 <br />2.07 Initial Acceptance of Schedules 9 <br />ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE 9 <br />3.01 Intent 9 <br />3.02 Reference Standards 10 <br />3.03 Reporting and Resolving Discrepancies 10 <br />3.04 Amending and Supplementing Contract Documents 10 <br />3.05 Reuse of Documents 10 <br />ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE <br />POINTS 11 <br />4.01 Availability of Lands 11 <br />4.02 Subsurface and Physical Conditions 11 <br />4.03 Differing Subsurface or Physical Conditions 11 <br />4.04 Underground Facilities 12 <br />4.05 Reference Points 13 <br />4.06 Hazardous Environmental Condition at Site 13 <br />ARTICLE 5 - BONDS AND INSURANCE 14 <br />5.01 Performance, Payment, and Other Bonds 14 <br />5.02 Licensed Sureties and Insurers 15 <br />5.03 Certificates of Insurance 15 <br />5.04 CONTRACTOR's Liability Insurance 15 <br />5.05 OWNER's Liability Insurance 16 <br />5.06 Property Insurance 16 <br />5.07 Waiver of Rights 17 <br />5.08 Receipt and Application of Insurance Proceeds 18 <br />5.09 Acceptance of Bonds and Insurance; Option to Replace 18 <br />5.10 Partial Utilization, Acknowledgment of Property Insurer 18 <br />ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES 18 <br />6.01 Supervision and Superintendence 18 <br />6.02 Labor; Working Hours 19 <br />6.03 Services, Materials, and Equipment 19 <br />6.04 Progress Schedule 19 <br />6.05 Substitutes and "Or -Equals" 19 <br />6.06 Concerning Subcontractors, Suppliers, and Others 21 <br />00700 - General Conditions REV 5-10-13 <br />00700 - 2 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1362-01d Dixie Hwy_Highland Dr\l-Admin\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.