My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-061A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-061A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:38:11 PM
Creation date
4/26/2019 1:10:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-060A
Agenda Item Number
8.D.
Entity Name
Vero Beach Roofing
Subject
Reverse Osmosis Plant Roof Replacement
Area
North Reverse Osmosis Plant
Project Number
IRC-1802
Bid Number
2019031
Alternate Name
RO Plant
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. low or damage to the completed Pro <br />or part thereof by OWNER during partial <br />1'1.04, or after final payment pursuant to <br />par -a 7. <br />covering any Ions, damage or consequential low <br />referred to in paragraph 5.07.B shall contain <br />5.08 Receipt and Application of Insurance <br />Proceeds <br />A. If either OWNER or CONTRACTOR has any <br />receipt of the certificates (or other evidence <br />requested) required by paragraph 2.05.C. OWNER <br />and CONTRACTOR shall each provide to the other <br />provided as the other may reasonably request. If <br />A. Any insured low under the policies of 5.10 Partial Utilization, Acknowledgment of <br />Property Insurer <br />B. OWNER as fiduciary shall have power to <br />5.09 Acceptance of Bonds and Insurance; Option <br />to Replace <br />00700 - 18 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1362-Ord Dixie Hwy_Highland Dr\1-Admin\Bid Documents Waster Contract Documents\00700 - General Conditions REV 5-10- <br />13.doc <br />A. If OWNER finds it necessary to occupy or use <br />a portion or portions of the Work prior to Substantial <br />Completion of all the Work as provided in paragraph <br />14.05, no such use or occupancy shall commence <br />before the insurers providing the property insurance <br />pursuant to paragraph 5.06 have acknowledged notice <br />thereof and in writing effected any changes in cover- <br />age necessitated thereby. The insurers providing the <br />property insurance shall consent by endorsement on <br />the policy or policies, but the property insurance shall <br />not be canceled or permitted to lapse on account of <br />any such partial use or occupancy. <br />ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES <br />6.01 Supervision and Superintendence <br />A. CONTRACTOR shall supervise, inspect, and <br />direct the Work competently and efficiently, devoting <br />such attention thereto and applying such skills and <br />expertise as may be necessary to perform the Work in <br />accordance with the Contract Documents. CON- <br />TRACTOR shall be solely responsible for the means, <br />methods, techniques, sequences, and procedures of <br />construction, but CONTRACTOR shall not be <br />responsible for the negligence of OWNER or <br />ENGINEER in the design or specification of a specific <br />00700 - General Conditions REV 5-10-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.