Laserfiche WebLink
el° <br />LIES! <br />Underwater Engineering Services, hw. <br />UESI Marine & Pier Construction Experience <br />CUSTOMER: St. Johns River Water Management District <br />PROJECT NAME: Fort Drum Conservation Area Boardwalk <br />STATE/COUNTRY: Florida, Indian River County <br />CUSTOMER CONTACT: Ray Gibson PHONE:321-863-0009 EMAIL: rgibson@sjrwmd.com <br />UESI PROJECT MANAGER: Andrew Connelly Project Manager / Lee Busbin Construction Supervisor <br />UESI PROJECT NUMBER: COM -2015251.00 <br />PROJECT DATES: 7/27/15 - 10/30/15 <br />PROJECT DESCRIPTION: Construction of an 800 foot timber boardwalk through Cypress Strand. Construction Value: <br />$151,830.00 <br />CUSTOMER: Flagler County <br />PROJECT NAME: Malacompra Elevated Boardwalks <br />STATE/COUNTRY: Florida, Flagler Beach <br />CUSTOMER CONTACT: Amy Kennedy PHONE: 386-313-4006 EMAIL: akennedy@flaglercounty.org <br />UESI PROJECT MANAGER: Andrew Connelly Project Manager / Lee Busbin Construction Supervisor <br />UESI PROJECT NUMBER: COM -2014236.00 <br />PROJECT DATES: 10/20/14 - 3/23/15 <br />PROJECT DESCRIPTION: Construction of an 1,100 foot boardwalk through coastal wetlands and upland oak hammock. <br />Construction Value: $522,340.00 <br />CUSTOMER: Volusia County Public Work Coastal Division <br />PROJECT NAME: Smyrna Dunes Park Fishing Pier <br />STATE/COUNTRY: Florida, New Smyrna Beach <br />CUSTOMER CONTACT: Joe Nolin PHONE: 386-248-8072 EMAIL: jnolin@volusia.org <br />UESI PROJECT MANAGER: Andrew Connelly Project Manager / Lee Busbin Construction Supervisor <br />UESI PROJECT NUMBER: COM -2016288.00 <br />PROJECT DATES: 01/26/17 <br />PROJECT DESCRIPTION: Construction of an 430 foot timber and composite fishing pier in the Ponce de Leon Inlet. Installed <br />forty-nine each 14" concrete piles from barge and crane system. Construction Value: $646,308.00 <br />CUSTOMER: St. Lucie County Parks and Special Facilities Division <br />PROJECT NAME: Pepper Park Boardwalks and Floating Docks <br />STATE/COUNTRY: Florida, Fort Pierce <br />CUSTOMER CONTACT: Matt Baum PHONE: 772-462-2551 EMAIL: baumm@stlucieco.org <br />UESI PROJECT MANAGER: Andrew Connelly Project Manager / Lee Busbin Construction Supervisor <br />UESI PROJECT NUMBER: COM -2017202.00 <br />PROJECT DATES: 01/10/17-01/17/17 <br />PROJECT DESCRIPTION: Construction of four timber boardwalks and two floating docks and gangways. Construction <br />Value: $378,643.84. <br />CUSTOMER: City of Port St. Lucie <br />PROJECT NAME: Rivergate Riverwalk Boardwalk Repairs <br />STATE/COUNTRY: Port St. Lucie, Florida, Fort Pierce <br />CUSTOMER CONTACT: Bradley Keen PHONE: 772-344-4005 EMAIL: bkeen@cityofpsl.com <br />UESI PROJECT MANAGER: Andrew Connelly Project Manager / Lee Busbin Construction Supervisor <br />UESI PROJECT NUMBER: COM -2018246.00 <br />PROJECT DATES: 06/22/18 — 12/22/2018 <br />PROJECT DESCRIPTION: Removed and repaired an existing timber boardwalk to include the removal of thermoplastic <br />handrail system. UESI installed forty four 12" diameter long timber piles with barge and crane and reconstructed the timber <br />boardwalk and installed composite decking. UESI subcontracted and installed 1,200 feet of aluminum handrails. Construction <br />Value: $452,865.91. <br />CUSTOMER: City of South Daytona <br />PROJECT NAME: Veterans Park Riverfront Fishing Pier <br />STATE/COUNTRY: Daytona Beach, Florida, USA <br />CUSTOMER CONTACT: Gregg Bartholomew PHONE: 386-322-3070 EMAIL: gbartholomew@southdaytona.org <br />UESI PROJECT MANAGER: Andrew Connelly Project Manager / Lee Busbin Construction Supervisor <br />UESI PROJECT NUMBER: COM2018252.00 <br />PROJECT DATES: 07/8/2018 — 09/30/2018 <br />PROJECT DESCRIPTION: Constructed a 110' timber fishing pier with composite grating deck and stainless steel cable <br />handrail system. Construction Value: $195,216.00. <br />Page 1 of 2 <br />