My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-061B
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-061B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:49:18 PM
Creation date
4/26/2019 1:52:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-061B
Agenda Item Number
8.H.
Subject
Wabasso Causeway Fishing Pier Demolition Project
Project Number
IRC-1712
Bid Number
2019035
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: , 20 <br />OWNER: Indian River County <br />CONTRACTOR. <br />CONTRACT FOR: WABASSO CAUSEWAY FISHING PIER DEMOLITION PROJECT <br />Project No. IRC -1712 <br />Project Description: The project consists of the demolition and disposal of the existing <br />Wabasso Causeway Fishing Pier, approach sidewalks and associated debris. The pier <br />was severely damaged during Hurricane Matthew in 2016, with eight sections displaced <br />and laying at the river bottom. The entire pier and support structure, which is <br />approximately 1000 feet long will be removed and placed at a permitted offshore artificial <br />reef site. <br />OWNER's Bid No. 2019035 <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />To. <br />OWNER <br />And To. <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br />substantially complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within 30 calendar <br />days of the above date of Substantial Completion. <br />The responsibilities between OWNER and CONTRACTOR for security, operation, safety, <br />maintenance, heat, utilities, insurance and warranties and guarantees shall be as follows: <br />00630 - Certificate of Substantial Completion REV 04-07 <br />00630 - 1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1712 Wabasso Fishing Pier -Bridge Removal\1-Admin\Bid Documents\Contract Documents\00630 - Certificate of <br />Substantial Completion REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.