My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-061B
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-061B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:49:18 PM
Creation date
4/26/2019 1:52:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-061B
Agenda Item Number
8.H.
Subject
Wabasso Causeway Fishing Pier Demolition Project
Project Number
IRC-1712
Bid Number
2019035
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pursuant to paragraph 10.05; provided that, in <br />lieu of executing any such Change Order, an <br />appeal may be taken from any such decision in <br />accordance with the provisions of the Contract <br />Documents and applicable Laws and Regula- <br />tions, but during any such appeal, <br />CONTRACTOR shall carry on the Work and <br />adhere to the progress schedule as provided in <br />paragraph 6.18.A. <br />10.04 Notification to Surety <br />A. If notice of any change affecting the general <br />scope of the Work or the provisions of the <br />Contract Documents (including, but not <br />limited to, Contract Price or Contract Times) <br />is required by the provisions of any Bond to <br />be given to a surety, the giving of any such <br />notice will be CONTRACTOR's responsibility. <br />The amount of each applicable Bond will be <br />adjusted to reflect the effect of any such <br />change. <br />10.05 Claims <br />and Disputes <br />A. Notice: Written notice stating the general <br />nature of each Claim, dispute, or other matter <br />shall be delivered by the claimant to <br />ENGINEER and the other party to the <br />Contract promptly (but in no event later than <br />30 days) after the start of the event giving rise <br />thereto. Notice of the amount or extent of the <br />Claim, dispute, or other matter with supporting <br />data shall be delivered to the ENGINEER and <br />the other party to the Contract within 60 days <br />after the start of such event (unless <br />ENGINEER allows additional time for <br />claimant to submit additional or more accu- <br />rate data in support of such Claim, dispute, or <br />other matter). A Claim for an adjustment in <br />Contract Price shall be prepared in <br />accordance with the provisions of paragraph <br />12.01.B. A Claim for an adjustment in <br />Contract Time shall be prepared in <br />accordance with the provisions of paragraph <br />12.02.B. Each Claim shall be accompanied <br />by claimant's written statement that the <br />adjustment claimed is the entire adjustment to <br />which the claimant believes it is entitled as a <br />result of said event. The opposing party shall <br />submit any response to ENGINEER and the <br />claimant within 30 days after receipt of the <br />claimant's last submittal (unless ENGINEER <br />allows additional time). <br />B. ENGINEER's Decision: ENGINEER will <br />render a formal decision in writing within 30 days after <br />receipt of the last submittal of the claimant or the last <br />submittal of the opposing party, if any. ENGINEER's <br />written decision on such Claim, dispute, or other <br />matter will be final and binding upon OWNER and <br />CONTRACTOR unless: <br />1. an appeal from ENGINEER's <br />decision is taken within the time limits and in <br />accordance with the dispute resolution <br />procedures set forth in Article 16; or <br />2. if no such dispute resolution <br />procedures have been set forth in Article 16, a <br />written notice of intention to appeal from <br />ENGINEER's written decision is delivered by <br />OWNER or CONTRACTOR to the other and to <br />ENGINEER within 30 days after the date of <br />such decision, and a formal proceeding is <br />instituted by the appealing party in a forum of <br />competent jurisdiction within 60 days after the <br />date of such decision or within 60 days after <br />Substantial Completion, whichever is later <br />(unless otherwise agreed in writing by OWNER <br />and CONTRACTOR), to exercise such rights or <br />remedies as the appealing party may have with <br />respect to such Claim, dispute, or other matter <br />in accordance with applicable Laws and <br />Regulations. <br />C. If ENGINEER does not render a formal <br />decision in writing within the time stated in paragraph <br />10.05.B, a decision denying the Claim in its entirety <br />shall be deemed to have been issued 31 days after <br />receipt of the last submittal of the claimant or the last <br />submittal of the opposing party, if any. <br />D. No Claim for an adjustment in Contract Price <br />or Contract Times (or Milestones) will be valid if not <br />submitted in accordance with this paragraph 10.05. <br />ARTICLE 11 - COST OF THE WORK; CASH <br />ALLOWANCES; UNIT PRICE WORK <br />11.01 Cost of the Work <br />A. Costs Included: The term Cost of the Work <br />means the sum of all costs necessarily incurred and <br />paid by CONTRACTOR in the proper performance of <br />the Work. When the value of any Work covered by a <br />Change Order or when a Claim for an adjustment in <br />Contract Price is determined on the basis of Cost of <br />the Work, the costs to be reimbursed to <br />CONTRACTOR will be only those additional or <br />incremental costs required because of the change in <br />the Work or because of the event giving rise to the <br />00700 - General Conditions REV 5-10-13 <br />00700 - 31 <br />F:\Public WorksENGINEERING DIVISION PROJECTS\1712 Wabasso Fishing Pier -Bridge Removah1-Admin\Bid Documents\Contract Documents\00700 - General Conditions REV 5-10- <br />13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.