Laserfiche WebLink
Work Order No. 11 <br />37th Street & Indian River Blvd <br />Intersection Improvements <br />System (NPDES) General Permit for Stormwater Discharges from Construction Activities, and the <br />FDEP Generic Permit for Stormwater Discharges from Construction Activities. <br />C. Jurisdicational Permitting: <br />The Consultant shall prepare permit applications for the St Johns River Water Management District <br />(SJRWMD) and Army Corp of Consultants (ACOE) for submittal by the County. This will consist of all <br />required evaluation, design, coordination, and follow-up work necessary to support permit applications. <br />The County will review the permit applications as necessary. The Consultant shall assemble and be <br />responsible for the final submittal. <br />The Consultant shall prepare permit sketches for submission by the County to ACOE and SJRWMD for <br />dredge and fill activities, if necessary. The Consultant shall submit all permit sketches on 8.5" x 11" <br />sheets. Sketches shall be neatly scaled, signed and sealed, and reproducible. <br />1. Environmental Resource Permitting/Section 404 Permitting <br />The Consultant will prepare and submit the joint Environmental Resource Permit (ERP) application <br />package to the SJRWMD and the ACOE. The application includes the ERP standard forms and a <br />compilation of supplemental materials such as permit sketches, Vegetation (FLUCFCS), soils, <br />quadrangle and FEMA -FIRM maps. <br />The Consultant will coordinate on the behalf of the County with each agency identified in this task. <br />This may include up to one (1) meeting with the agencies to discuss requests for additional <br />information (RAI), and written responses to one (1) request for additional information (RAI) including <br />plan modifications. This scope assumes that mitigation measures will not be necessary or required. <br />This scope assumes that coordination with US Fish and Wildlife Service through the preparation of <br />Biological Assessments or Biological Opinions will not be required. <br />Permit application submittals will be made subsequent to the 60% plan set submittal approval by the <br />County. <br />D. Signing and Pavement Marking Plans: <br />Signing and Pavement Marking plans shall include: Preparation of the plan layout, quantities (including <br />signing and pavement marking quantity) and tabulation of quantities. All plans are to be prepared in <br />accordance with the latest design standards and practices (MUTCD), FDOT Standard Specifications, <br />Indexes, and shall be accurate, legible, complete in design and drawn at the same scale as the Roadway <br />Plans, furnished in reproducible form. Plans will be included with the roadway plans and submitted as <br />indicated above. <br />E. Utility Coordination: <br />The CONSULTANT will coordinate with franchise utility operators in the vicinity of the project such that <br />the proposed construction activities can be developed to minimize impacts to existing utilities located <br />within the project limits. Any utility permitting and relocation design required to accommodate the <br />proposed improvements will be addressed as an additional service relative to this scope of work. <br />