My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-072
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:17:19 PM
Creation date
5/9/2019 3:14:28 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/07/2019
Control Number
2019-072
Agenda Item Number
8.F.
Entity Name
FDOT Florida Department of Transportation
Transportation Regional Incentive Program TRIP
State-Funded Grant Agreement
Subject
66th Avenue widening project from 49th Street to 69th Street
Project Number
IRC-1505
Document Relationships
2019-034
(Cover Page)
Path:
\Resolutions\2010's\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION <br />STATE -FUNDED GRANT AGREEMENT <br />EXHIBIT "A" <br />PROJECT DESCRIPTION AND RESPONSIBILITIES <br />FPN: 436379-1-54-01 <br />525-010-60 <br />PROGRAM MANAGEMENT <br />09/17 <br />Page 1 of 1 <br />This exhibit forms an integral part of the State -Funded Grant Agreement between the State of Florida, Department of <br />Transportation and <br />INDIAN RIVER COUNTY (the Recipient) <br />PROJECT LOCATION: <br />❑ The project is on the National Highway System. <br />❑ The project is on the State Highway System. <br />PROJECT LENGTH AND MILE POST LIMITS: 2.526 MILES <br />PROJECT DESCRIPTION: 66TH Avenue Roadway Widening from 49th Street to 69th Street. This Project will consist of <br />construction (widening) of 66th Avenue from a 2 lane to a 4 lane divided highway. The Project services will include, but is <br />not limited to widening, installation of exclusive turn lanes at major intersections, utility relocation, bridge replacement and <br />rehabilitation, installation of sidewalks, landscape, drainage improvements, and transit infrastructure <br />SPECIAL CONSIDERATIONS BY RECIPIENT: <br />The Agency is required to provide a copy of the design plans for the Department's review and approval to coordinate <br />permitting with the Department, and notify the Department prior to commencement of any right-of-way activities. <br />The Recipient shall commence the project's activities subsequent to the execution of this Agreement and shall perform in <br />accordance with the following schedule: <br />a) Construction to be completed by June 30, 2021 <br />If this schedule cannot be met, the Recipient will notify the Department in writing with a revised schedule or the project is <br />subject to the withdrawal of funding. <br />SPECIAL CONSIDERATIONS BY DEPARTMENT: <br />
The URL can be used to link to this page
Your browser does not support the video tag.