Laserfiche WebLink
Exhibit C <br />Landfill Gas System Inspection and Independent Landfill Gas Energy Engineering Support <br />PROJECT SCHEDULE <br />Tetra Tech is aware that the contract between IRC and the end-user are being negotiated. The LFG <br />inspection will be scheduled within two (2) weeks after approval of this proposal and the results <br />submitted in a memorandum format two weeks after completion of the inspection. Phase 2 <br />meetings/support will be completed at mutually agreed upon schedule and as requested by IRC. <br />