Laserfiche WebLink
2. loss or damage to the completed Pro <br />cause of Ioes covered by any property <br />or part thereof by OWNER during partial <br />14.04, or after final payment pursuant to <br />paragraph 14.07. <br />C. Any insurance policy maintained by OWNER <br />referred to in paragraph 5.07.6 shall contain <br />insurers will have no rights of recovery against <br />CONTRACTOR, Subcontractors, ENGINEER, or <br />ENGINEER's Consultants and the officers, directors, <br />5.08 Receipt and Application of Insurance <br />Proceeds <br />A. Any insured Ions under the policies of <br />with OWNER and made payable to OWNER az <br />agreement as thc parties in interest may reach. If no <br />other special agreement is reached, the damaged <br />B. OWNER as fiduciary shall have power to <br />days after the occurrence of loaf to OWNER's <br />exercise of this power. If such objection be made, <br />parties in interest may reach. If no such agreement <br />5.09 Acceptance of Bonds and Insurance; Option <br />to Replace <br />A. If either OWNER or CONTRACTOR has any <br />cions of thc Bonds or incurancc required to be <br />receipt of the certificates (or othcr evidence <br />any change in the required coverage. Without <br />protect such other party's interests at the expense of <br />5.10 Partial Utilization, Acknowledgment of <br />Property Insurer <br />A. If OWNER finds it necessary to occupy or use <br />a portion or portions of the Work prior to Substantial <br />Completion of all the Work as provided in paragraph <br />14.05, no such use or occupancy shall commence <br />before the insurers providing the property insurance <br />pursuant to paragraph 5.06 have acknowledged notice <br />thereof and in writing effected any changes in cover- <br />age necessitated thereby. The insurers providing the <br />property insurance shall consent by endorsement on <br />the policy or policies, but the property insurance shall <br />not be canceled or permitted to lapse on account of <br />any such partial use or occupancy. <br />ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES <br />6.01 Supervision and Superintendence <br />A. CONTRACTOR shall supervise, inspect, and <br />direct the Work competently and efficiently, devoting <br />such attention thereto and applying such skills and <br />expertise as may be necessary to perform the Work in <br />accordance with the Contract Documents. CON- <br />TRACTOR shall be solely responsible for the means, <br />methods, techniques, sequences, and procedures of <br />construction, but CONTRACTOR shall not be <br />responsible for the negligence of OWNER or <br />ENGINEER in the design or specification of a specific <br />00700 - General Conditions REV 5-10-13 <br />00700 - 18 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1728 IRC Courthouse Renovations Project\1-Admin\Bid Documents Master Contract Documentsl00700 - General Conditions REV 5- <br />10-13.doc <br />