My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-066C
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-066C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:14:19 PM
Creation date
5/10/2019 1:01:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/23/2019
Control Number
2019-066C
Agenda Item Number
8.D.
Entity Name
W & J Construction Corporation
Subject
Contract Documents and Specifications for IRC Courthouse Renovations Project
Project Number
IRC-1728
Bid Number
2019039
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
749
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Purchasing Division <br />purchasing@ircgov.com <br />ADDENDUM NO. 2 <br />Issue Date: February 19, 2019 <br />Project Name: INDIAN RIVER COUNTY COURTHOUSE RENOVATIONS PROJECT <br />Bid Number: 2019039 <br />Bid Opening Date: February 28, 2019 <br />This addendum is being released to answer questions received. The information and documents <br />contained in this addendum are hereby incorporated in the invitation to bid. This addendum must be <br />acknowledged where indicated on the bid form, or the bid will be declared non-responsive. <br />Attachment: <br />095113 Acoustical Panel Ceilings <br />Questions and Answers <br />1. Spec section 095113 Acoustic Panel Ceiling is missing from the spec book, please provide. <br />Section 095113 is attached. <br />2. Can you please confirm the Fire Alarm is Siemens (Johnson Control). <br />The brand of fire alarm system is Simplex. <br />3. <br />Can you please confirm the intent is that the low voltage contractor would only provide conduit and <br />raceway for the door control system? <br />If required by Building Code, the Contractor shall only run the conduit and raceways for the door <br />control system. The County's security contractor shall run wiring and install these systems. <br />4. Can you confirm on sheets T2.01 and T2.02, note FO represents flush trim zero data? <br />The highlighted areas are empty boxes, for the Owner's vendor to run security cables to that <br />location. <br />5. For the Access control, we would like to tie into the existing system, who is the manufacturer? <br />The manufacturer is Smith's Detection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.