My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-072A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-072A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:17:37 PM
Creation date
5/17/2019 8:59:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/07/2019
Control Number
2019-072
Agenda Item Number
15.B.1.
Entity Name
Geosyntec
Subject
South Gifford Road Landfill - Work Order No. 5
One year groundwater monitoring/reporting and related consulting services
Project Number
CCNA-2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />12 April 2019 <br />Page 2 <br />Geosyntec° <br />consultants <br />In consideration of the ongoing natural attenuation processes occurring at the site, the enhancement <br />of these biological processes via the injection of an electron donor was proposed and agreed to in <br />concept by the FDEP in correspondence dated 2 August 2006. In response to FDEP's request and <br />supported by groundwater monitoring results, Geosyntec conducted an injection event in 2017 <br />[Remedial Action Plan Modification Addendum No. 3 (RAPM 3)] to remediate recalcitrant CVOC <br />groundwater impacts in the former source area. Semi-annual performance monitoring associated <br />with bioremediation implementation is ongoing at monitoring wells GR-MW3OB and GR- <br />MW37B and conducted concurrently with groundwater monitoring of the plume monitoring well <br />network. <br />PROPOSED SCOPE OF WORK <br />The proposed scope of work consists of semi-annual groundwater monitoring and reporting and <br />related activities to be performed on behalf of IRC SWDD at the Former South Gifford Road <br />Landfill. For the purpose of budgeting, the scope of work has been divided into the following <br />tasks: <br />• Task 1 — Project Management; <br />• Task 2 — Meetings/Regulatory Interaction; <br />• Task 3 — Annual Pollution Remediation Liabilities Evaluation; <br />• Task 4 — Semi -Annual Sampling Activities; <br />• Task 5 — Data Evaluation and Semi -Annual Reporting; <br />The remainder of this section presents a general description of the activities to be performed in <br />each task. <br />Task 1 — Project Management: Under this task, Geosyntec will perform project planning and <br />management responsibilities, such as correspondence with IRC SWDD and FDEP, invoice review, <br />project coordination, and project administration. The budget includes six hours per <br />sampling/reporting event and one hour per month for the project manager (24 hours total), two <br />hours for the principal -in -charge, and one hour per month (12 hours total) for the administrative <br />assistant. <br />Task 2 — Meetings/Regulatory Interaction: Under this task, Geosyntec will prepare for and <br />attend up to two meetings, with IRC SWDD, FDEP, and/or IRC Board of County Commission, as <br />necessary. It has been assumed that one of these meetings will be in person and one meeting will <br />FR0766\XR19012 <br />engineers 1 scientists 1 innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.