My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-072A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-072A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 1:17:37 PM
Creation date
5/17/2019 8:59:33 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />12 April 2019 <br />Page 5 <br />Geosyntec ° <br />consultants <br />trend analyses, and/or statistical data analyses. The winter 2019 annual report will be supported by <br />attachments containing Chain -of -Custody sheets, field notes and observations, water sampling <br />logs, maps, graphs, analytical results, quantitative statistical evaluation, and other applicable <br />materials. As part of the statistical analysis, trend analysis graphs showing temporal concentrations <br />of constituents and a summary of the Mann -Kendall statistics will be included to identify <br />increasing, decreasing, or no trends in groundwater constituent concentrations. Historical data <br />summaries will be included for monitoring wells recommended for removal from the monitoring <br />plan. <br />The draft summer and winter 2019 reports will be submitted to IRC SWDD for review prior to <br />submittal to FDEP. Each final report will be signed and sealed by a Florida registered professional <br />engineer or geologist. <br />SCHEDULE <br />The semi-annual groundwater monitoring events will be tentatively conducted in June and <br />December 2019 as described herein. Reports will be submitted to FDEP to meet required <br />deadlines. <br />BUDGET ESTIMATE <br />A budget estimate for the scope of work outlined in Tasks 1 through 5 of this proposal is <br />summarized in the following table, and a detailed budget estimate is provided as Attachment A. <br />The budget estimate presented in this proposal is based on Geosyntec's understanding of the <br />project requirements, our experience gained from executing similar tasks for SWDD since 2002 at <br />the Site, and experience with groundwater monitoring and reporting activities at similar facilities. <br />Geosyntec will not exceed the budget estimate without prior approval and written authorization <br />from IRC SWDD. <br />Task 1 — Project Management $5,227 <br />Task 2 — Meetings/Regulatory Interaction $5,995 <br />Task 3 — Annual Pollution Remediation Liabilities Evaluation $2,668 <br />Task 4 — Semi -Annual Sampling Activities $47,126 <br />Task 5 — Data Evaluation and Semi -Annual Reporting $18,017 <br />TOTAL $79,033 <br />FR0766\XR19012 <br />engineers 1 scientists 1 innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.