My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-060A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-060A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:32:59 PM
Creation date
5/20/2019 1:22:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-060A
Agenda Item Number
8.D.
Entity Name
Vero Beach Roofing
Subject
Reverse Osmosis Plant Roof Replacement
Area
North Reverse Osmosis Plant
Project Number
IRC-1802
Bid Number
2019031
Alternate Name
RO Plant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01 11 00 (Revision No. 1) <br />SUMMARY OF WORK <br />PART 1 GENERAL <br />1.01 WORK COVERED BY CONTRACT DOCITMENTS <br />A. Project Name: Indian River County North RO Plant Roof Replacement <br />B. Project Address: 7751 58th Street, Vero Beach, Florida, 32967 <br />C. Owner: Indian River County <br />D. Engineer: The Contract Documents, dated December 18, 2018, were prepared by REI <br />Engineers, Inc. <br />E. This work includes the provision of all labor, material, equipment, supervision and <br />administration to integrate the work outlined in this project manual into the total building <br />system such that no leakage into the system occurs. In general, the scope of work in the <br />Base Bid will include: <br />1. Roof Sections A, B & C: (Approximately 11,713 square feet): Remove and <br />dispose of the existing roof system including flashings and sheet metal down to the <br />existing structural deck; resecure the existing edge nailers and gutters to remain in <br />place; adhere polyisocyanurate insulation system, provide adhere gypsum <br />coverboard, fully adhere felt -back thermoplastic single ply membrane along with <br />flashings and accessories and accessories and provide sheet metal flashings and <br />trim to provide a complete, watertight, 20 -year warrantable roof assembly. <br />2. Roof Sections D & E: (Approximately 6,785 square feet): Remove and dispose <br />of the existing roof system including flashings and sheet metal down to the existing <br />structural deck; resecure the existing edge nailers to remain in place; install wall <br />scupper drains, repair wall at abandoned scupper locations; install new counter <br />flashing; adhere polyisocyanurate insulation system, provide adhere gypsum <br />coverboard, fully adhere felt -back thermoplastic single ply membrane along with <br />flashings and accessories and accessories and provide sheet metal flashings and <br />trim to provide a complete, watertight, 20 -year warrantable roof assembly. <br />3 Roof Sections F: (Approximately 1,465 square feet): Remove and dispose of the <br />existing roof system including flashings and sheet metal down to the existing <br />structural deck; resecure the existing edge nailers to remain in place; install wall <br />scupper drains; repair wall at abandoned scupper locations; install new counter <br />flashing; adhere polyisocyanurate insulation system, provide adhere gypsum <br />coverboard, fully adhere felt -back thermoplastic single ply membrane along with <br />flashings and accessories and provide sheet metal flashings and trim to provide a <br />complete, watertight, 20 -year warrantable roof assembly. <br />4. Remove the existing lightning protection/grounding system prior to <br />commencement of roof replacement work. Upon completion of flashing and sheet <br />metal installation, all new or existing parts, components or materials will be <br />reinstalled or installed to meet UL requirements at the time of initial installation. <br />F. Asbestos Containing Roofing Materials (ACRM): <br />1. It is the intention of these specifications that no asbestos bearing materials be <br />incorporated into the work. In the event the contractor should determine <br />Indian River County North RO Plant <br />Roof Replacement 01 11 00-1 (Revision No. 1) Summary of Work <br />
The URL can be used to link to this page
Your browser does not support the video tag.