My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-060A
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-060A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:32:59 PM
Creation date
5/20/2019 1:22:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/09/2019
Control Number
2019-060A
Agenda Item Number
8.D.
Entity Name
Vero Beach Roofing
Subject
Reverse Osmosis Plant Roof Replacement
Area
North Reverse Osmosis Plant
Project Number
IRC-1802
Bid Number
2019031
Alternate Name
RO Plant
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EWGINEERS <br />DATE: January 28, 2019 <br />FROM: REI Engineers <br />REFERENCE: Specification and Drawing Update for Addendum No. 6 <br />Indian River County <br />IRC -1802 Indian River County North RO Plant Roof tReplacement <br />This addendum forms a part of the Contract Documents and modifies the original Bidding Documents, including <br />changes to the specifications and drawings as follows: <br />CHANGES TO SPECIFICATIONS: <br />1. Replace Specification Section ""01 11 00 Summary of Work" with attached "01 11 00 Summary of Work <br />(Revision No. 2)". Specification section has been updated to clarify the vapor barrier requirement. <br />2. Replace Specification Section ""07 22 16 Roof Insulation" with attached "07 22 16 Roof Insulation <br />(Revision No. 2)". Specification section has been updated to clarify the vapor barrier product <br />requirements. <br />CHANGES TO DRAWINGS: <br />3. Replace Specification Section "Contract Drawing R1" with attached "Contract Drawing RI (Revision No. <br />1)". Contract drawing has been updated to correct slope designation and to add a detail marker for the <br />knee wall. <br />4. Replace Specification Section "Contract Drawing D1" with attached "Contract Drawing D1 (Revision No. <br />1)". Contract drawing has been updated to incorporate to knee wall detail, clarify concrete anchor <br />requirements for wood nailers and clarify vapor barrier requirements. <br />5. Replace Specification Section "Contract Drawing D2" with attached "Contract Drawing D2 (Revision No. <br />1)". Contract drawing has been updated to incorporate requirement to include PVC plumbing for <br />secondary drains, clarify concrete anchor requirements for wood nailers and clarify vapor barrier <br />requirements. <br />Engineering solutions for tomorrow"" <br />PAGE 1 OF 2 <br />10150 Highland Manor Drive, Suite 200 reiengineers.com <br />Tampa, FL 33610 813.944.2137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.